Segment Thickness Design and Bearing Performance Analysis of Large Inner-Diameter Shield Tunnel under Lateral Unloading

被引:0
|
作者
Lu, Cirong [1 ]
Liu, Changbao [2 ]
Zhang, Xiaohui [3 ]
机构
[1] Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Peoples R China
[2] Powerchina Huadong Engn Corp, Hangzhou 311122, Peoples R China
[3] Tongji Univ, Key Lab Rd & Traff Engn, Minist Educ, Shanghai 201804, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 21期
基金
中国博士后科学基金; 中国国家自然科学基金; 上海市自然科学基金;
关键词
large inner-diameter shield tunnel; lateral unloading; segment thickness; bearing performance; DEFORMATION; DAMAGE;
D O I
10.3390/app132111871
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In order to accommodate more transportation-supporting facilities, the expansion of structures' inner diameter has become the development trend of metro shield tunnels. But for large inner-diameter shield tunnels, the segment thickness design and bearing performance characteristics of tunnels under lateral unloading are still unclear. The purpose of the research was to select the optimal segment thickness and clarify the bearing performance of large inner-diameter shield tunnels. Therefore, in this study, a 3D refined numerical model was established to analyze and determine the optimal segment thickness for a shield tunnel with an inner diameter of 5.9 m. Furthermore, a full-scale test was carried out to study the bearing performance of the shield tunnel under lateral unloading. The results showed that the maximum tunnel horizontal deformation difference between the calculation and the test did not exceed 5%, and the maximum difference in the overall structure deformation between the calculation and the test did not exceed 7%. Increasing the segment thickness can reduce the convergence deformation of the shield tunnel nonlinearly; the deformation reduction was no longer significant when the segment thickness increased to 400 mm with an inner diameter of 5.9 m. Under the lateral unloading condition, the internal force of the tunnel structure increased significantly at sections of 0 degrees, 55 degrees, 125 degrees, and 190 degrees. Compared with the normal design load stage, the maximum bending moment and axial force increased by 36% and 74.1%, respectively, in the final failure stage. There was no bolt yield during the entire unloading process, indicating that the excessive strength of the bolt could not fully play a role in the entire life cycle of the large inner-diameter tunnel structure. The failure mechanism of the shield tunnel can be described as follows: in the early stage of a load, a shield tunnel will appear with joints open and dislocated. As the load increases, cracks in different directions gradually appear near the tunnel joint. In the ultimate load stage, the shield tunnel loses load-bearing capacity, and large areas of falling blocks appear at the top and bottom of the tunnel.
引用
收藏
页数:23
相关论文
共 9 条
  • [1] Effects of lateral unloading on the mechanical and deformation performance of shield tunnel segment joints
    Shi Chenghua
    Cao Chengyong
    Lei Mingfeng
    Peng Limin
    Ai Huijun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 51 : 175 - 188
  • [2] STRUCTURE DESIGN OF KEY SEGMENT FOR THE NEW TUNNEL BUILDING TECHNOLOGY ABOUT ENLARGING SUBWAY STATION WITH LARGE-DIAMETER SHIELD TUNNEL
    Peng, Zhiyong
    Liu, Weining
    Ding, Deyun
    Yang, Xiuren
    Yan, Mei
    Lu, Weidong
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 850 - +
  • [3] In situ test analysis of segment uplift and dislocation of large-diameter slurry shield tunnel in silty clay
    Li, Mingyu
    Yu, Liucheng
    Chen, Jian
    Jin, Junwei
    Li, Penglin
    Li, Chunlin
    Tian, Yingfei
    Journal of Railway Science and Engineering, 2022, 19 (06) : 1705 - 1715
  • [4] Design and experimental study on waterproof gasket of large-diameter shield tunnel under ultra high water pressure
    Tuo, Yong-Fei
    Shu, Heng
    Guo, Xiao-Hong
    Ding, Wen-Qi
    Wang, Jian
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (SUPPL.1): : 227 - 231
  • [5] Numerical analysis of DRC segment under inner water pressure based on full-scale test verification for shield tunnel
    Zhang, W. J.
    Wang, J. H.
    Jin, M. M.
    Koizumi, A.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 56 : 157 - 167
  • [6] Theoretical analysis on the deformation of existing tunnel caused by under-crossing of large-diameter slurry shield considering construction factors
    Ding, Zhi
    Zhang, Mo-Bao
    Zhang, Xiao
    Wei, Xin-Jiang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 133
  • [7] Dynamic response analysis of ultra-large diameter shield tunnel in uneven soft and hard strata under surface blast load
    Yang, Chunshan
    Wei, Lixin
    Zhu, Min
    Liu, Liying
    Bao, Xiaohua
    Zhao, Zeqian
    Chen, Xiangsheng
    Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (21): : 12 - 20
  • [8] Structural damage and waterproof performance analysis of composite segment in large section shield tunnels under post-earthquake fire
    Zhang, Wenjun
    Lai, Taotao
    Zhang, Gaole
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2020, 53 : 69 - 74
  • [9] Face stability analysis of large-diameter underwater shield tunnel in soft-hard uneven strata under fluid-solid coupling
    Zhang, Shanglong
    Cheng, Xuansheng
    Zhou, Xinhai
    Sun, Yue
    GEOMECHANICS AND ENGINEERING, 2023, 32 (02) : 145 - 157