Maturity model approach for building effective process safety management systems

被引:1
|
作者
Kunt, Tekin [1 ]
Breen, Madonna [1 ]
Gokce, Seckin [2 ]
Munsil, Mike [1 ]
机构
[1] PSRG Inc, 800 West Sam Houston Pkwy South,Suite 107, Houston, TX 77042 USA
[2] PSRG Inc, Istanbul, Turkiye
关键词
maturity model; PSM improvement; PSM program review;
D O I
10.1002/prs.12543
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Usually, a gap analysis is conducted to address challenges encountered when building a process safety management (PSM) system from scratch, or for improving an already existing PSM program. Business maturity models, on the other hand, are useful management frameworks used to gauge the maturity of an organization in various disciplines or functions. The purpose of this paper is to introduce an adaptation of business maturity models to the PSM area.
引用
收藏
页码:233 / 238
页数:6
相关论文
共 50 条
  • [1] EVALUATING THE HEALTH AND SAFETY MATURITY OF SUSTAINABLE BUILDING PROJECTS USING A SUSTAINABLE HEALTH AND SAFETY MATURITY MODEL
    Orogun, Bezalel
    Issa, Mohamed H.
    JOURNAL OF GREEN BUILDING, 2023, 18 (04): : 57 - 78
  • [2] Research on Safety Management Maturity Model of Construction Company
    Zhang, Ming Xuan
    Zhang, Dong Lei
    Gao, Quan Chen
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1367 - 1372
  • [3] A maturity model for the involvement of stakeholders in the city resilience building process
    Gimenez, Raquel
    Labaka, Leire
    Hernantes, Josune
    TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2017, 121 : 7 - 16
  • [4] Integrated management systems assessment: a maturity model proposal
    Domingues, Pedro
    Sampaio, Paulo
    Arezes, Pedro M.
    JOURNAL OF CLEANER PRODUCTION, 2016, 124 : 164 - 174
  • [5] Building and Application of Personal Knowledge Management Maturity Comprehensive Evaluation Model
    Han, Xiaoying
    Chang, Dan
    Chen, Baowei
    LISS 2013, 2015, : 1111 - 1120
  • [6] Case Study and Maturity Model for Business Process Management Implementation
    Rohloff, Michael
    BUSINESS PROCESS MANAGEMENT, PROCEEDINGS, 2009, 5701 : 128 - 142
  • [7] Measurement of Maturity in Process Management in The Brazilian Public Sector: A Multicriteria Approach
    Bispo, Guilherme D.
    Relim, Tiago Eny
    Reis, Ana Carla B.
    Mariano, Ari Melo
    Ladeira, Marcelo
    Serrano, Andre Luiz M.
    VISION 2025: EDUCATION EXCELLENCE AND MANAGEMENT OF INNOVATIONS THROUGH SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE, 2019, : 5855 - 5869
  • [8] Maturity model of building maintenance management for New Zealand's state schools
    An Thi Hoai Le
    Domingo, Niluka
    Rasheed, Eziaku
    Park, Kenneth
    BUILDING RESEARCH AND INFORMATION, 2022, 50 (04) : 438 - 451
  • [9] A Model to Assess the Maturity Level of the Risk Management Process in Information Security
    Mayer, Janice
    Fagundes, Leonardo Lemes
    2009 IFIP/IEEE INTERNATIONAL SYMPOSIUM ON INTEGRATED NETWORK MANAGEMENT - WORKSHOPS, 2009, : 61 - 70
  • [10] Assessment on process safety management implementation maturity among major hazard installations in Malaysia
    Shanmugam, Kumaran
    Razak, Musab Abdul
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2021, 149 : 485 - 496