ALARP in Engineering: Risk Based Design and CBA

被引:1
作者
Alakbarli, Emin [1 ]
Hamedanian, Mohammad Mehdi [1 ]
Guarascio, Massimo [1 ]
机构
[1] Sapienza Univ, Dept Civil Construct & Environm Engn, Rome, Italy
来源
PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON COMPLEXITY, FUTURE INFORMATION SYSTEMS AND RISK, COMPLEXIS 2023 | 2023年
关键词
ALARP; CBA; Risk; Acceptability; Tolerability; Practicality; Reasonability;
D O I
10.5220/0011947600003485
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
It has not been far, over a century, since humankind conceived that hazardous incidents should be substantially managed to procrastinate the future could-be hazards. In the middle of the twentieth century, nonetheless, safety measures were passed by officials and introduced to authorities, and private sectors, so as to reduce risks, environmental impacts of the hazards and to evaluate probable outcomes. Therefore, the concept of ALARP, meaning 'as low as reasonably practicable' presented back then, has been implemented in risk reduction management to make decisions upon acceptability and tolerability of risks. In order to do so, a few so-called tools, such as Cost-Benefit Analysis, are specified to societal and other types of risks so that we could weigh the balance of the amount of capital to be invested on safety on the one hand, and the extracted benefit attained out of the investment on the other. This implementation opaquely carries on several social, socio-economic, political and even environmental implications. Nevertheless, it has brought up some concerns into proponents' mindset, ranging from practicality and political reality to calling into question whether ALARP is mainly theoretical. The aim of this study is to figure out whether Cost-Benefit Analysis can be an appropriate tool to analyse the true outcome(s) of ALARP. This paper will offer a critical point of view over the risk-evaluating concept to discern how much it has been practically efficient.
引用
收藏
页码:61 / 68
页数:8
相关论文
共 50 条
  • [41] Collaborating in decision making of sustainable building design: An experimental study comparing CBA and WRC methods
    Arroyo, Paz
    Fuenzalida, Camila
    Albert, Alex
    Hallowell, Matthew R.
    ENERGY AND BUILDINGS, 2016, 128 : 132 - 142
  • [42] Risk and Reliability Based Calibration of Design Codes for Submerged Floating Tunnels
    Baravalle, Michele
    Kohler, Jochen
    PROCEEDINGS OF 2ND INTERNATIONAL SYMPOSIUM ON SUBMERGED FLOATING TUNNELS AND UNDERWATER TUNNEL STRUCTURES (SUFTUS-2016), 2016, 166 : 247 - 254
  • [43] Risk based optimal design of detention dams considering uncertain inflows
    J. Yazdi
    A. Doostparast Torshizi
    B. Zahraie
    Stochastic Environmental Research and Risk Assessment, 2016, 30 : 1457 - 1471
  • [44] Value/Risk based Performance Evaluation of Integrated Product and Process Design
    Shah, Liaqat
    Etienne, Alain
    Siadat, Ali
    Vernadat, Francois
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 13 - 22
  • [45] Risk based optimal design of detention dams considering uncertain inflows
    Yazdi, J.
    Torshizi, A. Doostparast
    Zahraie, B.
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2016, 30 (05) : 1457 - 1471
  • [46] Construction Engineering Bidding Risk Analysis
    Yu, Fanjing
    Li, Junjie
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 2990 - +
  • [47] Risk and hazard management in rock engineering
    Sundaram, AV
    Contribution of Rock Mechanics to the New Century, Vols 1 and 2, 2004, : 19 - 27
  • [48] A Safety Engineering on the Design of Hemodialysis Systems
    Costa, Tulio H.
    Paiva, Breno L. A.
    Lopes, Andrei G.
    Bublitz, Frederico M.
    2018 IEEE INTERNATIONAL CONFERENCE ON CONSUMER ELECTRONICS (ICCE), 2018,
  • [49] Credit risk assessment for Engineering construction
    Lu, Shibao
    Wu, Chengguo
    Huang, Qiang
    Sun, Dongyong
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT ENGINEERING AND INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2009, : 286 - 289
  • [50] Vector model of the engineering infrastructure risk
    Stanik, Jerzy
    Protasowicki, Tomasz
    Worwa, Kazimierz
    FIRST INTERNATIONAL SYMPOSIUM ON RISK ANALYSIS AND SAFETY OF COMPLEX STRUCTURES AND COMPONENTS (IRAS 2019), 2019, 22 : 322 - 333