Determination of government guarantee and revenue cap in public-private partnership contracts

被引:6
作者
Jin, Hongyu [1 ]
Liu, Shijing [2 ]
Li, Jun [1 ,3 ]
Liu, Chunlu [1 ]
机构
[1] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
[2] Shandong Univ Finance & Econ, Sch Management Sci & Engn, Jinan, Peoples R China
[3] Sun Yat Sen Univ, Sch Intelligent Syst Engn, Guangzhou, Peoples R China
关键词
Government guarantee; Revenue cap; Public-private partnership; Bargaining game; CONCESSION PERIOD; INFRASTRUCTURE PROJECTS; PPP PROJECTS; RISK; OPTION; OPTIMIZATION; ALLOCATION; VALUATION; FINANCE;
D O I
10.1108/ECAM-06-2019-0311
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Considering there is a lack of research in determining the optimal levels of government guarantee and revenue cap, the objective of this research is to determine their optimal levels to achieve a reasonable financial risk allocation between governments and private investors while avoiding overly lucrative conditions for private investors. Design/methodology/approach Expanded net present value (NPV) analysis and bargaining game theory are employed to construct the core of the determination process. The risk gap between governments and private investors is assessed via an expanded NPV analysis to see if the financial risk has been shared reasonably, based on which the range of the government guarantee is decided. A bargaining model is then created to help locate the optimal level of the government guarantee. Finally, a revenue cap, often combined with the government guarantee in public-private partnership (PPP) agreements, will be determined if overly lucrative conditions for private investors are observed or governments suffer a risk spillover. Findings Referring to a real PPP project in Australia, Project BA is created to validate the applicability of the proposed determination process. The outcome shows that the proposed determination process in this paper is capable of determining the optimal levels of government guarantee and revenue cap. The government preferences towards risk allocation will influence the values of the optimal levels. Governments may also consider to alleviate the control over investors' net profits to mobilise private investors into PPP projects. Research limitations/implications There is a potential possibility that the revenue cap fails to control the financial risk for governments or the overly lucrative condition for private investors. In other words, even though the revenue cap is set at the minimal level, the financial risk for governments still beyond their tolerance range or the overly lucrative condition for private investors still occurs. Future research may focus on other financial protective schemes which help to better control the financial risks for governments and profits for private investors. Originality/value Government guarantees are frequently used as an investment incentive to reduce the probabilities of suffering loss for private investors. Nevertheless, the financial risks for governments may increase after providing guarantees and, as a result, revenue cap is required by governments to avoid placing themselves in an unprotected situation. By recognising the importance of the two contractual parameters, many scholars dig into their option values. However, there are very rare research works focussing on the method of determining the specific levels of government guarantee and revenue cap. To overcome the limitations of existing models and enrich the methodology for government guarantee and revenue cap determination, this paper contributes to the body of knowledge by developing a government guarantee and revenue cap determination process which contributes to a reasonable allocation of financial risks between governments and private investors.
引用
收藏
页码:393 / 414
页数:22
相关论文
共 50 条
  • [1] Pareto optimization of public-private partnership toll road contracts with government guarantees
    Song, Jinbo
    Zhao, Yunpeng
    Jin, Lulu
    Sun, Yan
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2018, 117 : 158 - 175
  • [2] Early Termination Mechanism of Public-Private Partnership Transportation Projects with Government Guarantee
    He, Yujia
    Shi, Lei
    Li, Zhongfu
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2022, 28 (04)
  • [3] Risk management in public-private partnership contracts
    Nisar T.M.
    Public Organization Review, 2007, 7 (1) : 1 - 19
  • [4] GOVERNMENT SUBSIDIES IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS BASED ON ALTRUISTIC THEORY
    Wang, Yinglin
    Liu, Jicai
    Gao, Ruolan
    Hwang, Bon-Gang
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2020, 24 (03) : 153 - 164
  • [5] Public-private partnership in Public Administration discipline: a literature review
    Wang, Huanming
    Xiong, Wei
    Wu, Guangdong
    Zhu, Dajian
    PUBLIC MANAGEMENT REVIEW, 2018, 20 (02) : 293 - 316
  • [6] PUBLIC-PRIVATE OR NEITHER PUBLIC NOR PRIVATE? PUBLIC PRIVATE PARTNERSHIP CONTRACTS AS A NEW CONTRACTUAL CATEGORY
    Belen Romano, Mariana
    EN LETRA, 2019, 6 (11-12): : 122 - 138
  • [7] Funding and Finance Analysis of Public-Private Partnership Highway Projects: Exploratory Study
    Fathi, Medya
    Shrestha, Pramen P.
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (03)
  • [8] Government Supports in Public-Private Partnership Contracts: Metro Line 4 of the Sao Paulo Subway System
    Brandao, Luiz E.
    Bastian-Pinto, Carlos
    Gomes, Leonardo Lima
    Labes, Marina
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2012, 18 (03) : 218 - 225
  • [9] Determining concession periods and minimum revenue guarantees in public-private-partnership agreements
    Jin, Hongyu
    Liu, Shijing
    Sun, Jide
    Liu, Chunlu
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 512 - 524
  • [10] Revenue Risk Allocation Mechanism in Public-Private Partnership Projects: Swing Option Approach
    Zhang, Shuhua
    Li, Jinghuan
    Li, Yu
    Zhang, Xiaoling
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (01)