Integrated optimization of stochastic resource scheduling and machine maintenance in prefabricated component production processes

被引:6
作者
Wang, Jingjing [1 ]
Liu, Huimin [1 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266525, Peoples R China
基金
中国国家自然科学基金;
关键词
Machine maintenance; Stochastic resource scheduling; Prefabricated components; Differential evolution algorithm; TRANSPORTATION;
D O I
10.1016/j.autcon.2023.105030
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Effective resource scheduling and machine maintenance are two important interactive factors to improve prefabricated component productions. However, previous studies focused on machine maintenance without simultaneously considering stochastic resource scheduling, or studied job scheduling but neglected the resource constraint and machine availability. This paper explores the interaction between resource scheduling and machine maintenance to optimize the maintenance decisions and human resources in the prefabricated component production process. To solve this problem, a new integrated optimization model with aim of minimizing the uncertain project duration under the cost constraint is formulated. A differential evolution algorithm is designed by incorporating the simulation method. A real-life example of prefabricated walls is used to demonstrate the significance of jointly optimizing stochastic resource scheduling and machine maintenance, and analyzes the effectiveness of related parameters on the production system. Related results provide a new perspective to simultaneously consider multiple factors in the production process for future research.
引用
收藏
页数:14
相关论文
共 47 条
  • [31] Optimal preventive maintenance policy of the balanced system under the semi-Markov model
    Wang, Jingjing
    Miao, Yonghao
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 213
  • [32] Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system
    Wang, Jingjing
    Qiu, Qingan
    Wang, Huanhuan
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 205
  • [33] Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment
    Wang, Zhaojing
    Liu, Yisheng
    Hu, Hao
    Dai, Lei
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (04)
  • [34] Dynamic response to demand variability for precast production rescheduling with multiple lines
    Wang, Zhaojing
    Hu, Hao
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5386 - 5401
  • [35] An approach for sustainable, cost-effective and optimised material design for the prefabricated non-structural components of residential buildings
    Wasim, Muhammad
    Han, Thomas Michael
    Huang, Haoran
    Madiyev, Miras
    Ngo Tuan Duc
    [J]. JOURNAL OF BUILDING ENGINEERING, 2020, 32 (32):
  • [36] Special issue: Reliability management of complex system
    Wu, Jianjun
    Li, Daqing
    Si, Shubin
    Gao, Ziyou
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (04) : 477 - 479
  • [37] Multi-mode resource-constrained project scheduling with uncertain activity cost
    Xie, Fang
    Li, Haitao
    Xu, Zhe
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2021, 168
  • [38] Opportunistic maintenance of production systems subject to random wait time and multiple control limits
    Yang, Li
    Zhao, Yu
    Peng, Rui
    Ma, Xiaobing
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2018, 47 : 12 - 34
  • [39] Optimal transportation planning for prefabricated products in construction
    Yi, Wen
    Wang, Shuaian
    Zhang, Abraham
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2020, 35 (04) : 342 - 353
  • [40] Yin J., 2021, SCI TECHNOLOGY ENG, V21, P9029