Integrated optimization of stochastic resource scheduling and machine maintenance in prefabricated component production processes

被引:6
作者
Wang, Jingjing [1 ]
Liu, Huimin [1 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266525, Peoples R China
基金
中国国家自然科学基金;
关键词
Machine maintenance; Stochastic resource scheduling; Prefabricated components; Differential evolution algorithm; TRANSPORTATION;
D O I
10.1016/j.autcon.2023.105030
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Effective resource scheduling and machine maintenance are two important interactive factors to improve prefabricated component productions. However, previous studies focused on machine maintenance without simultaneously considering stochastic resource scheduling, or studied job scheduling but neglected the resource constraint and machine availability. This paper explores the interaction between resource scheduling and machine maintenance to optimize the maintenance decisions and human resources in the prefabricated component production process. To solve this problem, a new integrated optimization model with aim of minimizing the uncertain project duration under the cost constraint is formulated. A differential evolution algorithm is designed by incorporating the simulation method. A real-life example of prefabricated walls is used to demonstrate the significance of jointly optimizing stochastic resource scheduling and machine maintenance, and analyzes the effectiveness of related parameters on the production system. Related results provide a new perspective to simultaneously consider multiple factors in the production process for future research.
引用
收藏
页数:14
相关论文
共 47 条
  • [1] Heuristic and metaheuristic approaches for parallel machine scheduling under resource constraints
    Abdeljaoued, Mohamed Amine
    Saadani, Nour El Houda
    Bahroun, Zied
    [J]. OPERATIONAL RESEARCH, 2020, 20 (04) : 2109 - 2132
  • [2] A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction
    Anvari, B.
    Angeloudis, P.
    Ochieng, W. Y.
    [J]. AUTOMATION IN CONSTRUCTION, 2016, 71 : 226 - 241
  • [3] Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
    Arashpour, Mehrdad
    Bai, Yu
    Aranda-mena, Guillermo
    Bab-Hadiashar, Alireza
    Hosseini, Reza
    Kalutara, Pushpitha
    [J]. AUTOMATION IN CONSTRUCTION, 2017, 84 : 146 - 153
  • [4] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Artigues, Christian
    Leus, Roel
    Nobibon, Fabrice Talla
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 175 - 205
  • [5] Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption
    Assia, Sadiqi
    El Abbassi, Ikram
    El Barkany, Abdellah
    Darcherif, Moumen
    El Biyaali, Ahmed
    [J]. ADVANCES IN OPERATIONS RESEARCH, 2020, 2020
  • [6] Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution
    Birjandi, Alireza
    Mousavi, S. Meysam
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 100 : 84 - 102
  • [7] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [8] Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm
    Chang, Chunguang
    Han, Mengyao
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [9] [陈伟 Chen Wei], 2017, [土木工程学报, China Civil Engineering Journal], V50, P115
  • [10] Parallel machine scheduling with additional resources: Notation, classification, models and solution methods
    Edis, Emrah B.
    Oguz, Ceyda
    Ozkarahan, Irem
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 230 (03) : 449 - 463