Uncertain demand based integrated optimisation for train timetabling and coupling on the high-speed rail network

被引:8
作者
Feng, Ziyan [1 ]
Cao, Chengxuan [1 ]
Mostafizi, Alireza [2 ]
Wang, Haizhong [2 ]
Chang, Ximing [1 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Oregon State Univ, Sch Civil & Construct Engn, Corvallis, OR USA
基金
中国国家自然科学基金;
关键词
Train timetabling; train coupling; high-speed rail network; uncertain demand; heuristic algorithm; PROGRAMMING APPROACH; PASSENGER; MODEL;
D O I
10.1080/00207543.2022.2042415
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Transportation is an important component in the logistics and production processes. To accurately match rapidly growing demand and limited transport capacity, the goal of minimising costs while ensuring high service quality under existing infrastructure has received significant attention. This paper presents an integrated optimisation approach for the short-term operational management under daily fluctuating demand, with a focus on two key strategic decisions: train timetabling and coupling. In particular, an integrated two-stage stochastic model and a combined heuristic local search algorithm with the branch-and-bound method are developed to (1) obtain the optimal demand assignment to the rail network, (2) investigate trains' coupling plans to avoid waste of resources when demand is low, and (3) add candidate trains to generate new feasible timetables when demand surges. To verify the solving method, a lower bound algorithm is introduced. Using a hypothetical small-scale and a real-world China high-speed rail network as numerical experiments, different demand scales and critical parameters are tested to obtain optimised timetables. The results show that good solutions are achieved in several seconds, making it possible to adjust trains' schedules efficiently and effectively according to the variable demand in short-term operational management.
引用
收藏
页码:1532 / 1555
页数:24
相关论文
共 39 条
[1]   Urban freight transport using passenger rail network: Scientific issues and quantitative analysis [J].
Behiri, Walid ;
Belmokhtar-Berraf, Sana ;
Chu, Chengbin .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2018, 115 :227-245
[2]  
Birge JR., 1997, INTRO STOCHASTIC PRO
[3]   Robust optimization models for integrated train stop planning and timetabling with passenger demand uncertainty [J].
Cacchiani, Valentina ;
Qi, Jianguo ;
Yang, Lixing .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2020, 136 :1-29
[4]   Approaches to a real-world Train Timetabling Problem in a railway node [J].
Cacchiani, Valentina ;
Furini, Fabio ;
Kidd, Martin Philip .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 58 :97-110
[5]   Solving a real-world train-unit assignment problem [J].
Cacchiani, Valentina ;
Caprara, Alberto ;
Toth, Paolo .
MATHEMATICAL PROGRAMMING, 2010, 124 (1-2) :207-231
[6]   Scheduling extra freight trains on railway networks [J].
Cacchiani, Valentina ;
Caprara, Alberto ;
Toth, Paolo .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2010, 44 (02) :215-231
[7]   Optimal capacity allocation under random passenger demands in the high-speed rail network [J].
Cao, Chengxuan ;
Feng, Ziyan .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2020, 88
[8]   Freight transportation using high-speed train systems [J].
Ertem, M. A. ;
Ozcan, M. Keskin .
TRANSPORTATION LETTERS-THE INTERNATIONAL JOURNAL OF TRANSPORTATION RESEARCH, 2016, 8 (05) :250-258
[9]   A branch-and-price approach for trip sequence planning of high-speed train units [J].
Gao, Yuan ;
Schmidt, Marie ;
Yang, Lixing ;
Gao, Ziyou .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2020, 92
[10]   First-train timing synchronisation using multi-objective optimisation in urban transit networks [J].
Guo, Xin ;
Wu, Jianjun ;
Zhou, Jin ;
Yang, Xin ;
Wu, Desheng ;
Gao, Ziyou .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (11) :3522-3537