A Two-Stage Approach of DEA and AHP in Selecting Optimal Wind Power Plants

被引:15
作者
Wang, Chia-Nan [1 ]
Nguyen, Hoang-Phu [2 ,3 ]
Wang, Jing-Wein [4 ]
机构
[1] Natl Kaohsiung Univ Sci & Technol, Dept Ind Engn & Management, Kaohsiung 80778, Taiwan
[2] Natl Kaohsiung Univ Sci & Technol, Dept Ind Engn & Management, Kaohsiung 80778, Taiwan
[3] Ho Chi Minh Int Univ Vietnam Natl Univ, Sch Business, Ho Chi Minh 70000, Vietnam
[4] Natl Kaohsiung Univ Sci & Technol, Inst Photon & Commun, Kaohsiung 80778, Taiwan
关键词
Mathematical models; Wind power generation; Wind speed; Wind farms; Renewable energy sources; Indexes; Fossil fuels; Analysis hierarchy process (AHP); data envelopment analysis (DEA); decision making; emerging markets; renewable energy; Vietnam; wind power plant; DECISION-MAKING; EFFICIENCY; LOCATION;
D O I
10.1109/TEM.2021.3110519
中图分类号
F [经济];
学科分类号
02 ;
摘要
Sustainable development has become a global tendency in the growth orientation of governments. Renewable energies such as wind and solar have attracted many concerns in reducing the level of fossil fuels dependence. One of the most significant stages in such a transmission process is determining the most suitable location. This article aims to propose a novelty approach combining two multiple criteria decision making models, namely data envelopment analysis (DEA) and analysis hierarchy process (AHP) to recommend the most optimal site for wind power plants. Vietnam has been one of the most successful ASEAN nations in attracting renewable energy investments; hence, the article considers it as a case study. In the first stage, there are five inputs and outputs conducted by DEA models to choose the five most potential alternatives among 12 locations for the next stage. In the second stage, the AHP model is implemented on five main criteria and 20 subcriteria that are referred to the options of experienced experts. The findings show that Ninh Thuan province, which is obtained with the highest final score (0.374), is the most suitable location for wind power plants construction. The article has contributed to renewable literature in terms of methodologies as well as to practice for both public and private stakeholders.
引用
收藏
页码:4299 / 4309
页数:11
相关论文
共 27 条
  • [1] Multi-criteria selection for a wind observation station location using analytic hierarchy process
    Aras, H
    Erdogmus, S
    Koç, E
    [J]. RENEWABLE ENERGY, 2004, 29 (08) : 1383 - 1392
  • [2] Location optimization of wind plants in Iran by an integrated hierarchical Data Envelopment Analysis
    Azadeh, A.
    Ghaderi, S. F.
    Nasrollahi, M. R.
    [J]. RENEWABLE ENERGY, 2011, 36 (05) : 1621 - 1631
  • [3] Location optimization of wind power generation-transmission systems under uncertainty using hierarchical fuzzy DEA: A case study
    Azadeh, Ali
    Rahimi-Golkhandan, Armin
    Moghaddam, Mohsen
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2014, 30 : 877 - 885
  • [4] SOME MODELS FOR ESTIMATING TECHNICAL AND SCALE INEFFICIENCIES IN DATA ENVELOPMENT ANALYSIS
    BANKER, RD
    CHARNES, A
    COOPER, WW
    [J]. MANAGEMENT SCIENCE, 1984, 30 (09) : 1078 - 1092
  • [5] Energy access is needed to maintain health during pandemics
    Broto, Vanesa Castan
    Kirshner, Joshua
    [J]. NATURE ENERGY, 2020, 5 (06) : 419 - 421
  • [6] MEASURING EFFICIENCY OF DECISION-MAKING UNITS
    CHARNES, A
    COOPER, WW
    RHODES, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1978, 2 (06) : 429 - 444
  • [7] An STEEP-fuzzy AHP-TOPSIS framework for evaluation and selection of thermal power plant location: A case study from India
    Choudhary, Devendra
    Shankar, Ravi
    [J]. ENERGY, 2012, 42 (01) : 510 - 521
  • [8] Duy N., 2019, ASIAN J MANAG SCI AP, V4, P77, DOI DOI 10.1504/AJMSA.2019.110380
  • [9] THE MEASUREMENT OF PRODUCTIVE EFFICIENCY
    FARRELL, MJ
    [J]. JOURNAL OF THE ROYAL STATISTICAL SOCIETY SERIES A-GENERAL, 1957, 120 (03): : 253 - 290
  • [10] The problem of windfarm location: A social multi-criteria evaluation framework
    Gamboa, Gonzalo
    Munda, Giuseppe
    [J]. ENERGY POLICY, 2007, 35 (03) : 1564 - 1583