Public Private Partnership to Brownfield Remediation Projects in China: A Combined Risk Evaluation Approach

被引:2
作者
Han, Qingye [1 ]
Qin, Yan [1 ]
Zhang, Heng [1 ]
Ke, Ginger Y. [2 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400044, Peoples R China
[2] Mem Univ Newfoundland, Fac Business Adm, St John, NF A1B 3X5, Canada
基金
中国国家自然科学基金;
关键词
brownfield; public private partnership; risk assessment; combined evaluation; FUZZY SYNTHETIC EVALUATION; WATER-SUPPLY PROJECTS; HEALTH-RISKS; REDEVELOPMENT; MANAGEMENT; MODEL;
D O I
10.3390/land13010056
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Brownfields have been receiving significant attention all over the world because of their potential threats to the environment and public health. However, a funding shortage constitutes the main obstacle to the brownfield remediation (BR). In China, to ease financial dilemmas, the governments seek collaborations with private-sector companies, i.e., the Public Private Partnership (PPP) mode. Despite all the benefits, BR and PPP contain high risks, making stakeholders extremely cautious about investing in such projects. To support the decision-making process of the public and private parties, this paper designs a comprehensive approach to evaluate the risks of BR PPP projects in China. In more detail, several commonly used risk methods, such as TOPSIS, GRE, and FSE, are employed to construct a combined risk evaluation process, which applies multiple combined evaluation techniques to iteratively integrate individual results from those methods until a valid common result is achieved. To show the practical implementation procedure of the proposed combined approach, a hypothetical case study is performed to assess the risks of seven BR PPP projects. The analytical process also verifies that the consistency and reliability of the risk evaluation result can be achieved effectively and efficiently by jointly deploying multiple risk methods through combined techniques. The proposed decision framework facilitates a novel research idea in evaluating complicated risk situations, and can be applied to other similar scenarios where uncertainties and inconsistencies are inevitable.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Review of studies on risk allocation and sharing in public-private partnership projects for infrastructure delivery
    Mazher, Khwaja Mateen
    FRONTIERS IN BUILT ENVIRONMENT, 2025, 11
  • [42] Fiscal Risk Management of Public-Private Partnership Projects: A Multidimensional Identification and Assessment Framework
    Xu, LiPing
    Liu, Ning
    Zhou, Linyu
    Lu, LanQi
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (02) : 166 - 192
  • [43] Risk allocation in public-private partnership water supply projects in Ghana
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (03) : 187 - 208
  • [44] RISK MANAGEMENT AT REALIZATION OF INFRASTRUCTURE PROJECTS UNDER PUBLIC-PRIVATE PARTNERSHIP
    Hrytsenko, L. L.
    Krasulya, T. Y.
    ACTUAL PROBLEMS OF ECONOMICS, 2011, (126): : 85 - 90
  • [45] Ex Post Risk Management in Public-Private Partnership Infrastructure Projects
    Xiong, Wei
    Zhao, Xianbo
    Yuan, Jing-Feng
    Luo, Sai
    PROJECT MANAGEMENT JOURNAL, 2017, 48 (03) : 76 - 89
  • [46] A New Approach to Evaluating and Selecting Public-Private Partnership (PPP) Projects
    Poon, Reagan Ho Him
    Lai, Kin Keung
    Fu, Ye-lin
    3RD INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE AND MANAGEMENT (ICSSM 2017), 2017, : 342 - 346
  • [47] Investigating the Driving Factors of Public Participation in Public-Private Partnership (PPP) Projects-A Case Study of China
    Luo, Ziqian
    Li, Junjie
    Wu, Zezhou
    Li, Shenghan
    Bi, Guoqiang
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (09)
  • [48] EARLY TERMINATION COMPENSATION UNDER DEMAND UNCERTAINTY IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS
    Song, Jinbo
    Yu, Yanzhu
    Jin, Lulu
    Feng, Zhuo
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2018, 22 (06) : 532 - 543
  • [49] Risk analysis of public-private partnership waste-to-energy incineration projects in China: a hybrid fuzzy DEMATEL-ISM approach
    Cheng, Min
    Liu, Lin
    Cheng, Xiaotong
    Tao, Li
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4255 - 4280
  • [50] Risk assessment of public-private partnership in Russia based on the fuzzy logic method
    Savrukov, A. N.
    Savrukov, N. T.
    Kozlovskaya, E. A.
    VOPROSY EKONOMIKI, 2020, (10): : 132 - 143