construction management;
repetitive construction project;
scheduling;
resource levelling;
work interruption;
optimization;
DIFFERENT OBJECTIVE FUNCTIONS;
COST OPTIMIZATION;
SCHEDULING METHOD;
MODEL;
IMPACTS;
BALANCE;
LINE;
D O I:
10.3846/jcem.2023.17568
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
Despite the significance of resource levelling, project managers lack various ways to smooth resource usage fluc-tuation of a repetitive construction project besides changing resource usage. Tolerating interruptions is an effective way to provide flexibility for a schedule but is ignored when solving resource levelling problems. Therefore, this paper investigates the impacts of interruptions on resource usage fluctuation and develops an integrated approach that simultaneously inte-grates two scheduling adjusting processes: changing resource usage and tolerating interruptions. In this paper, two inter-ruption conditions are proposed to identify which activities are suitable to be interrupted for smoothing resource usage fluctuation. The traditional resource levelling model is modified to a new scheduling model by incorporating interruptions. A two-stage GA-based scheduling algorithm is developed by integrating changing resource usage and tolerating interrup-tions. A commonly used pipeline project is adopted to illustrate the steps of the proposed approach and demonstrate its effectiveness and superiority through comparison with previous studies. A large-scale project further verifies the usability of the proposed approach. The results confirmed the feasibility to smooth resource usage fluctuation by interruptions, and the integrated approach can achieve a more competitive resource levelling result.