The Governor Mario M. Cuomo Bridge: Solutions to complex geotechnical conditions

被引:2
|
作者
Paradis, Matthew Louis [1 ,2 ]
机构
[1] HNTB New York City, Bridges, New York, NY 10118 USA
[2] HNTB New York City, Bridges, New York, NY 10118 USA
关键词
Foundations; Major Crossings; Piles and Piling; Bridges;
D O I
10.1680/jbren.22.00005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Deriving its name from a local Native American tribe and the Dutch word for sea, the Tappan Zee is perhaps the most difficult section along the Hudson River for building a bridge. One-meter swells, swift tides, winter storms and ice flows aside, the 5-kilometer crossing faces daunting circumstances beneath the surface in the form of poor and varied geotechnical conditions. Innovative design and construction first found a solution to these challenges in the 1950s with the completion of the Tappan Zee Bridge. However, with traffic volumes exceeding its design basis, exponentially increasing maintenance costs and functionally obsolete features, "the Tapp " was nearing the end of its serviceable life. Its twin-span replacement, the Governor Mario M. Cuomo Bridge, took a diametrically different approach to the river and its complex soil strata. This paper looks back briefly at the unique floating bridge strategy used in the 1950s before examining the deep-foundation approach of the 2010s. The $4 billion (USD) Cuomo Bridge took advantage of new resources such as driven pipe piles more than 115 meters in length, large displacement isolation bearings and modular joints, use of prefabricated components, and several massive barge-mounted cranes.
引用
收藏
页码:285 / 293
页数:9
相关论文
empty
未找到相关数据