Influence of Mining Sequence of Branch on Stope Pressure Behaviour on Continuous Mining and Continuous Backfilling

被引:0
|
作者
Lin, Hai [1 ]
Yang, Yang [1 ]
Chen, Cheng [2 ]
Ding, Chenxi [1 ]
机构
[1] Univ Sci & Technol Beijing, Sch Civil & Resource Engn, Beijing 100083, Peoples R China
[2] North China Univ Technol, Sch Civil Engn, Beijing 100144, Peoples R China
基金
中国国家自然科学基金;
关键词
continuous mining and continuous backfilling; mining sequences; stress distribution; surrounding rock control;
D O I
10.3390/pr12030442
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Instability in coal pillars and filling bodies is a common occurrence during the mining process of continuous mining and continuous backfilling (CMCB). In view of this, combining numerical simulation, similarity simulation, and on-site testing approaches, backfill mining models were established in Flac3d5.01 software, similarity model test bench, and "two-stage", "three-stage", and "four-stage" mining sequences were conducted; the stress characteristics of coal pillar-filling body and the displacement evolution law of surrounding rock have been compared under three typical mining sequences. The results show that compared to two-stage mining sequence, three-stage and four-stage mining sequences provide sufficient time for the solidification of the filling body. The coal pillar exhibits better stability in the early stage of mining, but the stress concentration phenomenon is more significant in the later stage of mining. The stress concentration coefficient is the highest when the width of the coal pillar is 10 m. The integrity of the overburden is intact in different mining sequences, with only a small amount of separation and longitudinal cracks. Increasing the number of mining stages significantly reduces the roof subsidence, with the maximum roof subsidence in the three- and four-stage mining sequences being only 62.0% and 33.9% of that in the two-stage mining sequence. "Two stages", "three stages", and "four stages" of mining sequences are implemented in response to the requirements of weak and thick coal seam mining in Haoyuan Coal Mine and gangue disposal in Chahasu Coal Mine. Good engineering applications are achieved, enabling the realisation of safe, green, and efficient coal mining.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] The law of rock pressure in the stope with blocking mining by the continuous miner
    Jiang, X. (jxjtyut@163.com), 1600, China University of Mining and Technology (31):
  • [2] Cemented Backfilling Mining Technology for Gently Inclined Coal Seams Using a Continuous Mining and Continuous Backfilling Method
    Lu, Bin
    Li, Yongliang
    Fang, Shizheng
    Lin, Hai
    Zhu, Ye
    SHOCK AND VIBRATION, 2021, 2021
  • [3] Cemented backfilling mining technology with continuous mining and continuous backfilling method for underground coal mine and typical engineering cases
    Li Y.
    Lu B.
    Yang R.
    Lin H.
    Xu B.
    Wang S.
    Liu C.
    Meitan Xuebao/Journal of the China Coal Society, 2022, 47 (03): : 1055 - 1071
  • [4] Asymmetric Deformation Mechanism of Roadway with Continuous Mining and Continuous Backfilling
    Weihao Zhu
    Feng Wang
    Shaojie Chen
    Dawei Yin
    Jingkui Zhou
    Zeqi Jie
    Yulong Zou
    Rock Mechanics and Rock Engineering, 2024, 57 : 2125 - 2142
  • [5] Asymmetric Deformation Mechanism of Roadway with Continuous Mining and Continuous Backfilling
    Zhu, Weihao
    Wang, Feng
    Chen, Shaojie
    Yin, Dawei
    Zhou, Jingkui
    Jie, Zeqi
    Zou, Yulong
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, 57 (03) : 2125 - 2142
  • [6] Overlying strata movement law of continuous mining and continuous backfilling cemented-fill mining
    Hai Lin
    Renshu Yang
    Bin Lu
    Yongliang Li
    Shizheng Fang
    Ziyi Fan
    Zhuangzhuang Li
    Environmental Earth Sciences, 2021, 80
  • [7] Overlying strata movement law of continuous mining and continuous backfilling cemented-fill mining
    Lin, Hai
    Yang, Renshu
    Lu, Bin
    Li, Yongliang
    Fang, Shizheng
    Fan, Ziyi
    Li, Zhuangzhuang
    ENVIRONMENTAL EARTH SCIENCES, 2021, 80 (20)
  • [8] Application of short-wall continuous mining and continuous backfilling cemented-fill mining technology
    Lin H.
    Yang R.-S.
    Li Y.-L.
    Lu B.
    Xu B.
    Fan Z.-Y.
    Li J.-N.
    Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2022, 44 (06): : 981 - 992
  • [9] Mining Method, Stope Design and Mining Sequence for Inmaculada Mine
    Samaniego, Antonio
    Gongora, V.
    Cabello, O.
    GEOTECHNICAL SYNERGY IN BUENOS AIRES 2015, 2015, 5 : 417 - 431
  • [10] Technology and practice of continuous mining and backfilling with wall system for water conservation
    Ma L.
    Wang S.
    Yu Y.
    Du H.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2021, 38 (05): : 902 - 910and987