Parameter probabilistic prediction for satellite power system based on unsupervised multi-dimensional sequence segmentation

被引:1
|
作者
Kang, Shouqiang [1 ]
Gao, Yanjiao [1 ]
Song, Yuchen [2 ,3 ]
Zhou, Ruzhi [2 ,4 ]
Pang, Jingyue [5 ]
机构
[1] Harbin Univ Sci & Technol, Sch Elect & Elect Engn, Harbin 150080, Peoples R China
[2] Harbin Inst Technol, Sch Elect & Informat Engn, Harbin 150080, Peoples R China
[3] Harbin Inst Technol, Zhengzhou Res Inst, Zhengzhou 450000, Peoples R China
[4] Shanghai Inst Satellite Engn, Shanghai 200240, Peoples R China
[5] Chongqing Technol & Business Univ, Sch Artificial Intelligence, Chongqing 400067, Peoples R China
基金
中国国家自然科学基金;
关键词
Satellite power system; Sequence segmentation; Unsupervised data classification; Parameters prediction; NEURAL-NETWORKS; MISSION;
D O I
10.1016/j.ast.2024.108933
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
With the increasing operational autonomy and mission complexity of satellites, the power system, as one of the most critical subsystems in a satellite platform, needs to provide high-quality and fast-response power output under complex load requirements. State monitoring is valuable to ensure the power system's stable and safe operation. Monitoring and predicting the key parameters based on the satellite power system's telemetry data are meaningful in detecting potential anomalies. However, the multi-physical high-dimensional telemetry data of the satellite power system are oriented to the operating conditions. The dynamic operating conditions of the satellite power system make it difficult to establish the proper parameter prediction model with high adaptability. To address these challenging issues, this paper proposes a parameter probabilistic prediction based on unsupervised time series segmentation. Firstly, the telemetry data under dynamic operation conditions are divided based on the unsupervised dynamic factor model and K-Means algorithm. The dynamic factor model is used to extract the common factor sequences of the multidimensional telemetry data according to the dynamic relationship between different parameters, followed by the clustering operation using K-Means to classify the multidimensional telemetry data into different sub-sequences. Secondly, a probabilistic prediction method based on the spatiotemporal fusion of multi-physical parameters is proposed. The method utilizes a Bayesian neural network to learn the spatial relationship between parameters and applies Gaussian process regression to establish the temporal dependence of parameters. Afterward, a specific strategy is utilized to fuse the prediction results of the two, thus realizing the fusion of spatio-temporal information of satellite multi-dimensional telemetry data. The experimental results based on the real meteorological satellite power system telemetry data in 2010 show that the average absolute errors of the key parameter predictions after the division of the working conditions are all less than 0.25, which is improved by more than 37.08 % compared with the pre-division. This indicates that the proposed method can well recognize the dynamic operation modes and has a positive advancing effect on the parameter prediction task. Meanwhile, the average absolute error of the proposed prediction method is improved by at least 40.4 % compared with other single prediction models. It shows that the method proposed in this paper can realize high-precision prediction of parameters, and has good application prospects in condition monitoring and anomaly detection of satellite power systems.
引用
收藏
页数:12
相关论文
共 9 条
  • [1] Prediction of rural tourism suitability based on multi-dimensional evaluation model
    Li Y.
    Proceedings of the Institution of Civil Engineers: Smart Infrastructure and Construction, 2023, 177 (01) : 25 - 34
  • [2] Fault diagnosis of satellite power system based on unsupervised knowledge acquisition and decision-making
    Suo, Mingliang
    Xing, Jingyi
    Ragulskis, Minvydas
    Dong, Yanchen
    Zhang, Yonglan
    Lu, Chen
    ADVANCED ENGINEERING INFORMATICS, 2024, 62
  • [3] Neural network based multi-dimensional feature forecasting for bad data detection and feature restoration in power systems
    Teeuwsen, S. P.
    Erlich, I.
    El-Sharkawi, M. A.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3310 - +
  • [4] Neural networks for link prediction in realistic biomedical graphs: a multi-dimensional evaluation of graph embedding-based approaches
    Crichton, Gamal
    Guo, Yufan
    Pyysalo, Sampo
    Korhonen, Anna
    BMC BIOINFORMATICS, 2018, 19
  • [5] Neural networks for link prediction in realistic biomedical graphs: a multi-dimensional evaluation of graph embedding-based approaches
    Gamal Crichton
    Yufan Guo
    Sampo Pyysalo
    Anna Korhonen
    BMC Bioinformatics, 19
  • [6] Nonlinear Stochastic Time-varying System Identification Based on Multi-dimensional Taylor Network with Optimal Structure
    Zhang, Chao
    Yan, Hong-Sen
    2016 16TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS), 2016, : 30 - 34
  • [7] Photovoltaic power prediction system based on multi-stage data processing strategy and improved optimizer
    Zhang, Linyue
    Wang, Jianzhou
    Qian, Yuansheng
    Li, Zhiwu
    APPLIED MATHEMATICAL MODELLING, 2024, 132 : 226 - 251
  • [8] A multi-modal unsupervised fault detection system based on power signals and thermal imaging via deep AutoEncoder neural network
    Cordoni, Francesco
    Bacchiega, Gianluca
    Bondani, Giulio
    Radu, Robert
    Muradore, Riccardo
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2022, 110
  • [9] Photovoltaic power combination prediction system based on improved multi-objective optimization algorithm and nonlinear weighting strategy
    Wang, Jianzhou
    Guo, Honggang
    Song, Aiyi
    EXPERT SYSTEMS, 2023, 40 (03)