Historical information based iterated greedy algorithm for distributed flowshop group scheduling problem with sequence-dependent setup times

被引:38
作者
He, Xuan [1 ]
Pan, Quan-Ke [1 ,2 ]
Gao, Liang [3 ]
Neufeld, Janis S. [4 ]
Gupta, Jatinder N. D. [5 ]
机构
[1] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200072, Peoples R China
[2] Liaocheng Univ, Sch Comp Sci, Liaocheng 252000, Peoples R China
[3] Huazhong Univ Sci & Technol, State Key Lab Intelligent Mfg Equipment & Technol, Wuhan 430074, Peoples R China
[4] Tech Univ Dresden, Fac Business & Econ, Dresden, Germany
[5] Univ Alabama Huntsville, Coll Business Adm, Huntsville, AL USA
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2024年 / 123卷
关键词
Distributed flowshop; Group scheduling; Total flow time; Iterated greedy; Domination criterion; Historical information; MINIMIZING MAKESPAN; PERMUTATION FLOWSHOPS; SEARCH ALGORITHM; TOTAL FLOWTIME; OPTIMIZATION; MINIMIZATION; MACHINE; HEURISTICS; GENERATION;
D O I
10.1016/j.omega.2023.102997
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Distributed flowshop group scheduling problem (DFGSP) is commonly seen in modern industry. However, research works on DFGSP with total flow time criterion are rarely reported. The DFGSP consists of three coupled sub-problems, i.e., factory assignment for each group, group sequence in each factory, and job sequence within each group. A historical information-based iterated greedy algorithm (HIG) is proposed for solving the DFGSP with the objective of minimizing total flow time. The HIG integrates an iterated greedy algorithm (IG) with a group-based insertion operator, a job-based insertion operator, a domination criterion-based swap operator, and a historical information-based constructive solution method. The domination criterion is an effective inequality, which can deterministically optimize the objective value of a partial sequence even if the scheduling sequence of subsequent jobs is unknown. In the constructive solution method, a set covering model is designed to capture the effective factory allocation patterns for the groups hidden in the historical solutions to speed up the search for the IG. The comprehensive experiments on 810 test instances demonstrate the effectiveness of HIG.
引用
收藏
页数:19
相关论文
共 64 条
[1]   Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times [J].
Behjat, Saeed ;
Salmasi, Nasser .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (01) :22-48
[2]   Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times [J].
Celano, Giovanni ;
Costa, Antonio ;
Fichera, Sergio .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8) :695-705
[3]  
Chen S, 2023, Swarm Evol Comput, P81
[4]   A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems [J].
Chung, CS ;
Flynn, J ;
Kirca, O .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (03) :185-196
[5]   Distributed shop scheduling: A comprehensive review on classifications, models and algorithms [J].
Duan, Jianguo ;
Wang, Mengting ;
Zhang, Qinglei ;
Qin, Jiyun .
MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2023, 20 (08) :15265-15308
[6]   Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling [J].
Fernandez-Viagas, Victor ;
Molina-Pariente, Jose M. ;
Framinan, Jose M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 282 (03) :858-872
[7]   The distributed permutation flow shop to minimise the total flowtime [J].
Fernandez-Viagas, Victor ;
Perez-Gonzalez, Paz ;
Framinan, Jose M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 :464-477
[8]   A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem [J].
Fernandez-Viagas, Victor ;
Framinan, Jose M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) :1111-1123
[9]   On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem [J].
Fernandez-Viagas, Victor ;
Framinan, Jose M. .
COMPUTERS & OPERATIONS RESEARCH, 2014, 45 :60-67
[10]   An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem [J].
Gao, Jian ;
Chen, Rong ;
Deng, Wu .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) :641-651