Analysis of factors influencing resource scheduling for emergency construction projects considering multiple spatial characteristics

被引:1
作者
Peng, Jun Long [1 ]
Liu, Xiao [1 ]
机构
[1] Changsha Univ Sci & Technol, Chang Sha City, Peoples R China
来源
DEVELOPMENTS IN THE BUILT ENVIRONMENT | 2024年 / 17卷
关键词
Emergency construction project management; Resource scheduling; Multi-space; Analysis of influencing factors; Fuzzy-DEMATEL-ISM; IMPLEMENTATION; COST; SAFETY;
D O I
10.1016/j.dibe.2024.100329
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In response to the growing frequency of international emergencies, the demand for resources dedicated to emergency construction projects has significantly increased due to their pivotal role in disaster containment and mitigation. This article examines the factors influencing the allocation of multi-spatial resources for such projects, conducting both causal and hierarchical analyses to unveil their interdependent mechanisms. It addresses a theoretical research gap in resource scheduling through bibliometric analysis. The study utilizes the Fuzzy Decision-Making Laboratory Analysis (Fuzzy-DEMATEL) method to identify key factors within the system and constructs a hierarchical model using Interpretive Structural Modeling (ISM) to systematically analyze the factors affecting multi-space resource allocation in emergency construction projects. The results reveal 43 influencing factors, categorized into 11 levels, with the political and social environment, resource scheduling determination, and design changes standing out as the primary influencers. Additionally, the article proposes a three-tiered strategy based on experimental results to offer theoretical insights for multi-spatial resource scheduling in emergency construction projects.
引用
收藏
页数:15
相关论文
共 60 条
  • [1] Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing
    Abdzadeh, Behnam
    Noori, Siamak
    Ghannadpour, Seyed Farid
    [J]. AUTOMATION IN CONSTRUCTION, 2022, 140
  • [2] Artificial Intelligence in Advanced Manufacturing: Current Status and Future Outlook
    Arinez, Jorge F.
    Chang, Qing
    Gao, Robert X.
    Xu, Chengying
    Zhang, Jianjing
    [J]. JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2020, 142 (11):
  • [3] Multi-resource scheduling and routing for emergency recovery operations
    Bodaghi, Behrooz
    Shahparvari, Shahrooz
    Fadaki, Masih
    Lau, Kwok Hung
    Ekambaram, Palaneeswaran
    Chhetri, Prem
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2020, 50
  • [4] Emergency management of self-evacuation from flood hazard areas in Poland
    Borowska-Stefanska, Marta
    Balazovicova, Lenka
    Goniewicz, Krzysztof
    Kowalski, Michal
    Kurzyk, Paulina
    Masny, Matej
    Wisniewski, Szymon
    Zoncova, Michaela
    Khorram-Manesh, Amir
    [J]. TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2022, 107
  • [5] Emergency Rescue Vehicle Dispatch Planning Using a Hybrid Algorithm
    Cao, Jie
    Han, He
    Jiang, Yi-Ping
    Wang, Ya-Jing
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2018, 17 (06) : 1865 - 1890
  • [6] Managing resources in disaster recovery projects
    Chang, Yan
    Wilkinson, Suzanne
    Potangaroa, Regan
    Seville, Erica
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (05) : 557 - +
  • [7] Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China
    Chang, Yan
    Wilkinson, Suzanne
    Potangaroa, Regan
    Seville, Erica
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (01) : 37 - 48
  • [8] Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions
    Chang, Yan
    Wilkinson, Suzanne
    Potangaroa, Regan
    Seville, Erica
    [J]. HABITAT INTERNATIONAL, 2011, 35 (02) : 199 - 205
  • [9] A fuzzy credit-rating approach for commercial loans: a Taiwan case
    Chen, LH
    Chiou, TW
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (04): : 407 - 419
  • [10] Risk analysis of public-private partnership waste-to-energy incineration projects in China: a hybrid fuzzy DEMATEL-ISM approach
    Cheng, Min
    Liu, Lin
    Cheng, Xiaotong
    Tao, Li
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4255 - 4280