An overview of BIM adoption barriers in the Middle East and North Africa developing countries

被引:24
作者
El Hajj, Claudette [1 ]
Martinez Montes, German [2 ]
Jawad, Dima [3 ]
机构
[1] Univ Granada, Civil Engn, Granada, Spain
[2] Univ Granada, Construct & Engn Projects, Granada, Spain
[3] Notre Dame Univ Louaize, Civil & Environm Engn, Zouk Mosbeh, Lebanon
关键词
Building information modeling; BIM; Barriers; Limitations; Construction industry; INNOVATION; IMPLEMENTATION;
D O I
10.1108/ECAM-05-2021-0432
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose In an attempt to attain a better understanding of the research work on building information modeling (BIM) adoption, this study aims to examine the criticality of BIM adoption barriers in the Middle East and North Africa (MENA) developing countries from the lens of the sociotechnical theory. Further, the study investigates the differences in the perceptions of various constructions players (owners, contractors and designers) to BIM barriers, as well as possible discrepancies in the perception of BIM users and non-BIM users to the significance of the perceived constraints. Design/methodology/approach To reach this aim, the study starts with a systematic evaluation and a critical review of the literature on BIM barriers. A set of 22 BIM adoption limitations was drawn from the literature which was used to design the survey. To capture a broad perception, a mixed approach was used, and data were collected through an interview study and a survey involving Architecture, Engineering and Construction professionals in the MENA construction sector. The collected data were analyzed using the mean score, standard deviation and nonparametric tests. The further principal component analysis (PCA) grouped the barriers to uncover the latent factors of BIM barriers. Findings The actors ranked the barriers as follows: lack of knowledge and BIM awareness, commercial issues and investment cost, lack of skills and BIM specialist, interoperability and lack of client demand. The examination of the PCA resulted in four underlying BIM limitation factors namely: human, technological, structural and financial. The analysis of the ranking indicated that 16 of the 22 barriers are considered critical in the MENA area. The results of the Mann-Whitney test indicated that there is a statistically significant difference in perceptions of BIM users and nonuser for seven barriers, pointing out that users care most about the financial barriers; however, nonusers are mostly concerned with structural and technological barriers. However, the results of the Kruskal-Wallis test indicated that there is no statistically significant difference in the perceptions of the three categories of stakeholders in ranking all BIM barriers. Practical implications The outcomes will back policymakers and construction participants with the knowledge to develop policy propositions that can positively affect BIM adoption in the construction industry. The significance of this study lies in being one of the very first explorative investigations that comparatively and empirically explored BIM adoption barriers across the whole MENA developing countries. Originality/value While several research studies have examined BIM adoption barriers in various countries, none to the best of the authors' knowledge have attempted to study the whole MENA region as one entity, and none highlighted the impact of user's roles on their perception of adoption barriers within their community. The results contribute to the discussion of the relationship among practitioners' level of involvement in BIM projects and their perception of adoption barriers which is underrepresented in extant studies. The above can assist with prioritizing the barriers that are considered to be more significant given the characteristics of the community under study. The result revealed the value of the structural and human attributes in prioritizing BIM adoption barriers within the MENA construction industry.
引用
收藏
页码:889 / 913
页数:25
相关论文
共 51 条
  • [1] Ahmed S.H., 2020, 2020 IEEE 8 R10 HUM, P1, DOI DOI 10.1109/R10-HTC49770.2020.9357016
  • [2] Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia
    Aibinu, Ajibade
    Venkatesh, Sudha
    [J]. JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2014, 140 (03)
  • [3] BIM in the Saudi Arabian construction industry: state of the art, benefit and barriers
    Al-Yami, Abdullah
    Sanni-Anibire, Muizz O.
    [J]. INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2021, 39 (01) : 33 - 47
  • [4] THE BARRIERS AND STRATEGIES OF IMPLEMENTING BIM IN SAUDI ARABIA
    Alhumayn, Saud
    Chinyio, Ezekiel
    Ndekugri, Issaka
    [J]. BUILDING INFORMATION MODELLING (BIM) IN DESIGN, CONSTRUCTION AND OPERATIONS II, 2017, 169 : 55 - 67
  • [5] Amer A.A.M., 2016, CONCEPTUAL DEV CRITI, P275
  • [6] Comparative analysis of drivers to BIM adoption among AEC firms in developing countries A case of Nigeria
    Babatunde, Solomon Olusola
    Ekundayo, Damilola
    Adekunle, Adedayo Opeyemi
    Bello, Wasiu
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) : 1425 - 1447
  • [7] The Issues and Considerations Associated with BIM Integration
    Bataw, Anas
    Kirkham, Richard
    Lou, Eric
    [J]. 4TH INTERNATIONAL BUILDING CONTROL CONFERENCE 2016 (IBCC 2016), 2016, 66
  • [8] Bosch-Sijtsema Petra, 2017, Visualization in Engineering, V5, DOI 10.1186/s40327-017-0040-7
  • [9] Chan C.T., 2014, Journal of System and Management Sciences, V4, P24
  • [10] Bridging BIM and building (BBB) for information management in construction The underlying mechanism and implementation
    Chen, Ke
    Lu, Weisheng
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (07) : 1518 - 1532