A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time

被引:0
作者
Nagano, Marcelo Seido [1 ]
Rossi, Fernando Luis [2 ]
机构
[1] Univ Sao Paulo, Dept Engn Prod, Sao Carlos, Brazil
[2] Fed Inst Sao Paulo, Ind Engn Dept, Sao Paulo, Brazil
关键词
Mixed no-idle; Makespan; Total completion time; Multi-objective; DIFFERENTIAL EVOLUTION ALGORITHM; TOTAL FLOWTIME MINIMIZATION; PERMUTATION FLOWSHOP; TOTAL TARDINESS; M-MACHINE; OPTIMIZATION ALGORITHM; GENETIC ALGORITHM; MEMETIC ALGORITHM; WAIT FLOWSHOPS; LOCAL SEARCH;
D O I
10.5267/j.jpm.2023.9.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Advanced production systems usually are complex in nature and aim to deal with multiple performance measures simultaneously. Therefore, in most cases, the consideration of a single objective function is not sufficient to properly solve scheduling problems. This paper investigates the multi-objective mixed no-idle flowshop scheduling problem. The addressed optimization case is minimizing makespan subject to an upper bound on total completion time. To solve this problem, we proposed a two-stage iterated greedy and a multi-objective constructive heuristic. Moreover, we developed a new multi-objective improvement procedure focusing on increasing the performance of the developed methods in solving the addressed problem. and a new initialization procedure. We performed several computational tests in order to compare our developed methods with the main algorithms from similar scheduling problems in the literature. It was revealed that the proposed approaches give the best results compared with other state-of-the-art performing methods. & COPY; 2024 Growing Science Ltd. All rights reserved.
引用
收藏
页码:45 / 60
页数:16
相关论文
共 102 条
[1]   A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (02) :157-180
[2]   No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan [J].
Allahverdi, Ali ;
Aydilek, Harun ;
Aydilek, Asiye .
APPLIED MATHEMATICS AND COMPUTATION, 2020, 365
[3]   No-wait flowshop scheduling problem with two criteria; total tardiness and makespan [J].
Allahverdi, Ali ;
Aydilek, Harun ;
Aydilek, Asiye .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 269 (02) :590-601
[4]   Algorithms for no-wait flowshops with total completion time subject to makespan [J].
Allahverdi, Ali ;
Aydilek, Harun .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12) :2237-2251
[5]   Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness [J].
Allali, Karam ;
Aqil, Said ;
Belabid, Jabrane .
SIMULATION MODELLING PRACTICE AND THEORY, 2022, 116
[6]  
[Anonymous], 2013, INT J OPERATIONS RES, V10, P29
[7]   On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time [J].
Aqil, Said ;
Allali, Karam .
ANNALS OF OPERATIONS RESEARCH, 2021, 296 (1-2) :615-637
[8]   Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem [J].
Arabameri, Sedighe ;
Salmasi, Nasser .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) :902-916
[9]   Genetic local search for multi-objective flowshop scheduling problems [J].
Arroyo, JEC ;
Armentano, VA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) :717-738
[10]   Heuristics for no-wait flowshops with makespan subject to mean completion time [J].
Aydilek, Harun ;
Allahverdi, Ali .
APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (01) :351-359