Joint scheduling of barges and tugboats for river-sea intermodal transport

被引:15
作者
Hao, Luyao [1 ,2 ]
Jin, Jian Gang [1 ,2 ]
Zhao, Ke [1 ,2 ,3 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, Shanghai 200240, Peoples R China
[2] Shanghai Jiao Tong Univ, State Key Lab Ocean Engn, Shanghai 200240, Peoples R China
[3] China COSCO Shipping Corp Ltd, Shanghai 200127, Peoples R China
基金
中国国家自然科学基金;
关键词
Barge traffic management; Tugboat assignment; State-space-time network model; Variable neighborhood search; OPTIMIZATION; SEAPORT;
D O I
10.1016/j.tre.2023.103097
中图分类号
F [经济];
学科分类号
02 ;
摘要
In this paper, we study a barge and tugboat joint scheduling problem arising from a river-sea intermodal transport system, where non-self-propelled barges travel with the help of tugboats between an inland river bulk port and sea transshipment platforms to transport cargo. Due to limited channels and the sequential scheduling among ships, transit inefficiency and resource under-utilization often occur, thus it is essential to design barge timetables and tugboat paths. This paper jointly schedules barges and tugboats in a river-sea transshipment port with a tidally influenced channel, and focuses on barge round trips with multiple legs. We construct a statespace-time network from the perspective of tugboats, in which the state implies whether a barge is served by a tugboat. The problem is formulated as an integer programming model based on the network to minimize time taken for bulk cargo transshipment. A tailored variable neighborhood search algorithm is designed and its efficiency, effectiveness, and stability are demonstrated by numerical experiments, which are based on real data from the Boffa port. It is demonstrated that, by joint scheduling barges and tugboats, transfer efficiency can be significantly improved under limited tugboat resources and shorter tidal windows. The results also provide managerial insights on schedule and valuable conclusions about the resource allocation in the port.
引用
收藏
页数:21
相关论文
共 40 条
[1]   Vessel scheduling with pilotage and tugging considerations [J].
Abou Kasm, Omar ;
Diabat, Ali ;
Bierlaire, Michel .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 148
[2]  
[Anonymous], 2022, Seaborne Trade Monitor
[3]   A follow-up survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) :675-689
[4]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[5]   The rollon-rolloff vehicle routing problem [J].
Bodin, L ;
Mingozzi, A ;
Baldacci, R ;
Ball, M .
TRANSPORTATION SCIENCE, 2000, 34 (03) :271-288
[6]   Storage yard operations in container terminals: Literature overview, trends, and research directions [J].
Carlo, Hector J. ;
Vis, Iris F. A. ;
Roodbergen, Kees Jan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (02) :412-430
[7]   Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals [J].
Chargui, Kaoutar ;
Zouadi, Tarik ;
El Fallahi, Abdellah ;
Reghioui, Mohamed ;
Aouam, Tarik .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
[8]  
Clarksons R, 2022, PORTS CONAKRY GUINEA
[9]  
Gendreau M., 2019, Handbook of Metaheuristics
[10]   A multi-mode resource-constrained project scheduling reformulation for the waterway ship scheduling problem [J].
Hill, Alessandro ;
Lalla-Ruiz, Eduardo ;
Voss, Stefan ;
Goycoolea, Marcos .
JOURNAL OF SCHEDULING, 2019, 22 (02) :173-182