Six Sigma Project Prioritization and Selection Using AHP-CODAS Integration: A Case Study in Healthcare Industry

被引:15
作者
Can, Gulin Feryal [1 ]
Toktas, Pelin [1 ]
Pakdil, Fatma [2 ]
机构
[1] Baskent Univ, Ind Engn Dept, Baglica Kampusu, TR-06790 Ankara, Turkey
[2] Eastern Connecticut State Univ, Dept Management & Mkt, Willimantic, CT 06226 USA
关键词
Six sigma; Industries; Analytic hierarchy process; Uncertainty; Sensitivity analysis; Personnel; Linguistics; Analytical hierarchy process (AHP); combinative distance-based assessment (CODAS); multicriteria decision-making (MCDM); project prioritization; Six Sigma project (SSP); ANALYTIC HIERARCHY PROCESS; CRITICAL SUCCESS FACTORS; FUZZY CODAS; NEUTROSOPHIC CODAS; CONCEPTUAL-FRAMEWORK; PORTFOLIO SELECTION; SITE SELECTION; IMPLEMENTATION; DECISION; METHODOLOGY;
D O I
10.1109/TEM.2021.3100795
中图分类号
F [经济];
学科分类号
02 ;
摘要
Given the complex nature of Six Sigma project (SSP) prioritization and selection processes, multicriteria decision-making (MCDM) methods may help organizations identify the most effective projects. Considering potential limitations of subjective methods and advantages of MCDM methods, this article proposes a model that integrates analytical hierarchy process (AHP) and combinative distance-based assessment (CODAS) in SSP prioritization and selection process. In the proposed approach, AHP is employed to assign criteria weights, and CODAS is performed to determine priorities of SSPs. CODAS was advanced in term of its threshold function. Differences between Euclidean distances of two alternatives were compared, based on the standard deviation of Euclidean distances of all alternatives to overcome the subjectivity. This is the first study that combines AHP and CODAS methods for SSP selection, and CODAS is used with objective threshold value computation, and developed for the healthcare industry. In this article, ten SSPs were evaluated for four key criteria groups as financial, operational, patient centric, and organizational main criteria groups. In total, 18 subcriteria were considered under these four main criteria groups. This article provides a support for executives who make implementation plans for the potential SSPs.
引用
收藏
页码:3587 / 3600
页数:14
相关论文
共 100 条
[31]  
Hamurcu M, 2017, SIGMA J ENG NAT SCI, V8, P291
[32]   CODAS METHOD FOR 2-TUPLE LINGUISTIC PYTHAGOREAN FUZZY MULTIPLE ATTRIBUTE GROUP DECISION MAKING AND ITS APPLICATION TO FINANCIAL MANAGEMENT PERFORMANCE ASSESSMENT [J].
He, Tingting ;
Zhang, Siqi ;
Wei, Guiwu ;
Wang, Rui ;
Wu, Jiang ;
Wei, Cun .
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2020, 26 (04) :920-932
[33]   The state-of-the-art integrations and applications of the analytic hierarchy process [J].
Ho, William ;
Ma, Xin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 267 (02) :399-414
[34]   A framework for Six Sigma project selection in higher educational institutions, using a weighted scorecard approach [J].
Holmes, Monica C. ;
Jenicke, Lawrence O. ;
Hempel, Jessica L. .
QUALITY ASSURANCE IN EDUCATION, 2015, 23 (01) :30-46
[35]   A framework for the selection of Six Sigma projects in services: case studies of banking and health care services in Taiwan [J].
Hsieh, Ying-Jiun ;
Huang, Lan-Ying ;
Wang, Chi-Tai .
SERVICE BUSINESS, 2012, 6 (02) :243-264
[36]   A multi-objective model for project portfolio selection to implement lean and Six Sigma concepts [J].
Hu, G. ;
Wang, L. ;
Fetch, S. ;
Bidanda, B. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (23) :6611-6625
[37]   Hospital nurse shift length, patient-centered care, and the perceived quality and patient safety [J].
Jarrar, Mu'taman ;
Minai, Mohd Sobri ;
Al-Bsheish, Mohammad ;
Meri, Ahmed ;
Jaber, Mustafa .
INTERNATIONAL JOURNAL OF HEALTH PLANNING AND MANAGEMENT, 2019, 34 (01) :E387-E396
[38]   A conceptual framework for critical success factors of lean Six Sigma Implementation on the performance of electronic manufacturing service industry [J].
Jeyaraman, K. ;
Teo, Leam Kee .
INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2010, 1 (03) :191-215
[39]  
Kahraman C, 2008, J MULT-VALUED LOG S, V14, P599
[40]   Bi-objective project portfolio selection in Lean Six Sigma [J].
Kalashnikov, Vyacheslav ;
Benita, Francisco ;
Lopez-Ramos, Francisco ;
Hernandez-Luna, Alberto .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 186 :81-88