Probability of Risk Factors Affecting Small-Scale LNG Supply Chain Activities in the Indonesian Archipelago

被引:1
作者
Machfudiyanto, Rossy Armyn [1 ]
Humang, Windra Priatna [2 ]
Wahjuningsih, Nurul [3 ]
Kamil, Insannul [4 ]
Putra, Yanuar Yudha Adi [1 ]
机构
[1] Univ Indonesia, Fac Engn, Dept Civil Engn, Kampus Baru UI Depok, Depok 16424, Indonesia
[2] Natl Res & Innovat Agcy, Res Ctr Transportat Technol, Tangerang Selatan 15314, Indonesia
[3] Inst Teknol Bandung, Fac Civil & Environm Engn, Bandung 40132, Indonesia
[4] Univ Andalas, Fac Engn, Dept Ind Engn, Kampus Limau, Padang 25163, Indonesia
关键词
archipelago; risk; Small-Scale LNG; supply chain; DELPHI METHOD; INFRASTRUCTURE;
D O I
10.3390/infrastructures8040074
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In Indonesia, the CoS for power supply increased from Rp. 1025 to Rp. 1334/KWh from 2016 to 2021, respectively; this indicates an inefficient process in electricity provision. One contributing factor to this inefficiency is the existence of many high speed diesel (HSD)-fueled power plants. These are distributed across the Indonesian archipelago with a supply chain that only uses sea transportation. The absence of an economical small-scale LNG (SS-LNG) supply chain also demonstrates the inadequate infrastructure for distributing LNG to refineries. This study aims to analyze the probability of risks that occur in SS-LNG supply chains in the Indonesian archipelago. The analytical methods used are descriptive statistical analysis and Delphi analysis through in-depth interviews and Focus Group Discussions (FGD) with experts. Results showed that the SS-LNG supply chain process in Indonesia includes LNG loading, unloading, shipping, picking, storage, regasification, and distribution. There are 30 risk indicators that may occur, with the highest risks including ship accidents, equipment damage, lack of transport ships, bad weather, earthquakes, tsunami, poor safety cultures, and low levels of safety leadership. These risk indicators can be used in implementing SS-LNG.
引用
收藏
页数:17
相关论文
共 45 条
[21]  
Handfield R. B., 2007, SUPPLY CHAIN RISK MA, P29, DOI DOI 10.1201/9781420013306
[22]  
Handfield R.B., 2008, Supply Chain Risk Management: Minimizing Disruptions in Global Sourcing
[23]  
Humang W.P., 2019, Int. J. Eng. Res. Technol., V12, P2997
[24]  
Humang W.P., 2020, Int. J. Eng. Res. Technol., V13, P831, DOI [10.37624/IJERT/13.5.2020.831-841, DOI 10.37624/IJERT/13.5.2020.831-841]
[25]  
Humang W.P., 2019, Adv. Sci. Technol. Eng. Syst. J., V4, P278, DOI [DOI 10.25046/AJ040335, 10.25046/aj040335]
[26]  
Humang WP, 2017, INT CONF ADV LOGISTI, P165, DOI 10.1109/ICAdLT.2017.8547034
[27]  
jdih, LEG INF SECT DIT BIN
[28]   The liquefied natural gas infrastructure and tanker fleet sizing problem [J].
Koza, David Franz ;
Ropke, Stefan ;
Molas, Anna Boleda .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 99 :96-114
[29]  
Kumar R., 2018, Research Methodology: A Step-By-Step Guide for Beginners
[30]  
Machfudiyanto R.A., 2022, Jurnal Infrastruktur, V8, P71