An adaptive machine learning algorithm for the resource-constrained classification problem

被引:8
|
作者
Shifman, Danit Abukasis [1 ]
Cohen, Izack [1 ]
Huang, Kejun [3 ]
Xian, Xiaochen [2 ]
Singer, Gonen [1 ]
机构
[1] Bar Ilan Univ, Fac Engn, IL-5290002 Ramat Gan, Israel
[2] Univ Florida, Ind & Syst Engn Dept, Gainesville, FL 32611 USA
[3] Univ Florida, Dept Comp & Informat Sci & Engn, Gainesville, FL 32611 USA
基金
以色列科学基金会;
关键词
Classification; Resource constraints; Resource allocation; Cost-sensitive learning; Adaptive learning; COST-SENSITIVE CLASSIFICATION; DECISION TREE;
D O I
10.1016/j.engappai.2022.105741
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Resource-constrained classification tasks are common in real-world applications such as allocating tests for disease diagnosis, hiring decisions when filling a limited number of positions, and defect detection in manufacturing settings under a limited inspection budget. Typical classification algorithms treat the learning process and the resource constraints as two separate and sequential tasks. We develop an adaptive learning approach that considers resource constraints and learning jointly by iteratively fine-tuning misclassification costs. Via a structured experimental study using a publicly available data set, we evaluate a decision tree classifier that utilizes the proposed approach. The adaptive learning approach performs significantly better than alternative approaches, especially for difficult classification problems in which the performance of common approaches may be unsatisfactory. The suggested approach reaches similar classification decisions for different costs, thus it may be useful when misclassification costs are not known precisely or are costly to achieve. We envision the suggested learning approach as an important addition to the repertoire of techniques for handling resource-constrained classification problems.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Resource-Constrained Binary Image Classification
    Park, Sean
    Wicker, Jorg
    Dost, Katharina
    DISCOVERY SCIENCE, DS 2024, PT II, 2025, 15244 : 215 - 230
  • [42] Tiny Robot Learning: Challenges and Directions for Machine Learning in Resource-Constrained Robots
    Neuman, Sabrina M.
    Plancher, Brian
    Duisterhof, Bardienus P.
    Krishnan, Srivatsan
    Banbury, Colby
    Mazumder, Mark
    Prakash, Shvetank
    Jabbour, Jason
    Faust, Aleksandra
    de Croon, Guido C. H. E.
    Reddi, Vijay Janapa
    2022 IEEE INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE CIRCUITS AND SYSTEMS (AICAS 2022): INTELLIGENT TECHNOLOGY IN THE POST-PANDEMIC ERA, 2022, : 296 - 299
  • [43] Discrete imperialist competitive algorithm for the resource-constrained hybrid flowshop problem
    Tao, Xin-Rui
    Li, Jun-Qing
    Han, Yu-Yan
    Duan, Peng
    Gao, Kai-Zhou
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2020, 37 (07) : 345 - 359
  • [44] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82
  • [45] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [46] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [47] Genetic Algorithm Parameters Tuning for Resource-constrained Project Scheduling Problem
    Tian, Xingke
    Yuan, Shengrui
    ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955
  • [48] Improved differential evolution algorithm for resource-constrained project scheduling problem
    Lianghong Wu1
    2.College of Electrical and Information Engineering
    JournalofSystemsEngineeringandElectronics, 2010, 21 (05) : 798 - 805
  • [49] Improved differential evolution algorithm for resource-constrained project scheduling problem
    Wu, Lianghong
    Wang, Yaonan
    Zhou, Shaowu
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2010, 21 (05) : 798 - 805
  • [50] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    Dorndorf, U
    Pesch, E
    Phan-Huy, T
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) : 413 - 439