COVID-19 emerging risk assessment for the construction industry of developing countries: evidence from Iraq

被引:9
作者
Al-Mhdawi, M. K. S. [1 ]
Brito, Mario [1 ]
Onggo, B. S. [2 ]
Qazi, Abroon [3 ]
O'Connor, Alan [4 ]
机构
[1] Univ Southampton, Ctr Risk Res, Southampton Business Sch, Southampton, England
[2] Univ Southampton, Ctr Operat Res Management Sci & Informat Syst, Southampton Business Sch, Southampton, England
[3] Amer Univ Sharjah, Sch Business Adm, Sharjah, U Arab Emirates
[4] Trinity Coll Dublin, Dept Civil Struct & Environm Engn, Dublin, Ireland
关键词
COVID-19; pandemic; risks; risk assessment; developing countries; FOCUS-GROUP; IMPACT;
D O I
10.1080/15623599.2023.2169301
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In developing countries, the construction industry has been one of the hardest hit by the COVID-19 pandemic. The impact of the pandemic has created a whole new set of risks, causing workforce-related issues, supply chain disruptions, and legal and contractual implications. This research aims to identify and quantitatively analyse COVID-19 emerging risks in the construction industry of Iraq. A mixed method approach was used for data collection and analysis, including a focus group session to identify COVID-19 emerging risks, a survey to rate the identified risks, and the development of a fuzzy-based risk assessment model to analyse the level of riskiness of the identified risks. Results indicate that the most critical COVID-19 risks are (1) contract suspension, (2) contractor bankruptcy, (3) materials price escalation, (4) construction contract claims, (5) inappropriate risk allocation, (6) non-compliance with social distancing guidelines, (7) skills shortage, and (8) poor site and virtual communication. This paper contributes to the body of knowledge by providing academics and industry practitioners with a more comprehensive understanding of the risks arising from the COVID-19 pandemic. Moreover, this paper presents a novel model for analysing risks related to extreme conditions, such as the COVID-19 pandemic and future pandemics.
引用
收藏
页码:693 / 706
页数:14
相关论文
共 63 条
[1]  
Abd El Khalek H., 2016, INT J INNOV RES ENG, V3, P134
[2]   Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects [J].
Abdul Nabi, Mohamad ;
El-adaway, Islam H. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
[3]  
Abdulhussein H., 2016, INT J ENG RES, V4, P114
[4]  
Afkhamiaghd A Mahdi, 2020, J Emerg Manag, V18, P9, DOI 10.5055/jem.2020.0481
[5]   The impact of COVID-19 on the construction industry in Ghana: the case of some selected firms [J].
Agyekum, Kofi ;
Kukah, Augustine Senanu ;
Amudjie, Judith .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2022, 20 (01) :222-244
[6]  
Al Mhdawi Mohammed K., 2020, 10th International Conference on Engineering, Project, and Production Management. Lecture Notes in Mechanical Engineering (LNME), P421, DOI 10.1007/978-981-15-1910-9_35
[7]  
Al Mhdawi Mohammed K., 2020, 10th International Conference on Engineering, Project, and Production Management. Lecture Notes in Mechanical Engineering (LNME), P407, DOI 10.1007/978-981-15-1910-9_34
[8]  
Al-Mhdawi MKS., 2022, P CIVIL ENG RES IREL
[9]  
Al-Mhdawi MKS, 2022, RISK MANAGEMENT CON
[10]   Early Impacts of the COVID-19 Pandemic on the United States Construction Industry [J].
Alsharef, Abdullah ;
Banerjee, Siddharth ;
Uddin, S. M. Jamil ;
Albert, Alex ;
Jaselskis, Edward .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (04) :1-21