Optimizing the Spare Unit Ordering Strategies for Replacement Under Constrained Availability From a Mathematical Perspective

被引:1
作者
Dong, Wenjie [1 ]
Du, Junliang [1 ]
Hua, Chenchen [1 ]
Liu, Sifeng [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Econ & Management, Nanjing 211106, Peoples R China
来源
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS | 2023年 / 53卷 / 08期
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Availability constraint; average cost rate; expected cost effectiveness; replacement; spare parts ordering; SYSTEM SUBJECT; MAINTENANCE; POLICIES; MODELS; OPTIMIZATION; SHOCKS;
D O I
10.1109/TSMC.2023.3257882
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This article investigates the optimal ordering policies of spare parts for preventive replacement of a single component deteriorating system in this article. The operational system suffers from a deterioration process and is also subject to random shocks during its service, where discrete shocks are categorized into fatal ones and nonfatal ones. To preventing the catastrophic losses resulting from degraded failures or shock incurred failures, a spare unit for replacement is ordered at some time between the system's initial operation and its undesirable failure. The average cost rate with lower-limit constrained availability is minimized to seek the optimal spare unit ordering time, in which the Kuhn-Tucker necessary condition is satisfied. As a comparison strategy, the expected cost effectiveness defined as the ratio of system availability to average cost rate is maximized to dynamically adjust the optimum ordering time of the spare unit. Numerical experiments are designed to validate the existence and uniqueness of the joint optimal spare unit ordering and preventive replacement policies, as well sensitivity analysis of critical parameters are conducted.
引用
收藏
页码:4799 / 4807
页数:9
相关论文
共 44 条
[1]   QMCD approach for perishability models: The (S, s) control policy with lead time [J].
Barron, Yonit ;
Baron, Opher .
IISE TRANSACTIONS, 2020, 52 (02) :133-150
[2]   Optimal preventive replacement last policy for a successive random works system with random lead time [J].
Chang, Chin-Chih .
COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2023, 52 (04) :1202-1216
[3]   Optimal agereplacement scheduling for a random work system with random leadtime [J].
Chang, Chin-Chih .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) :5511-5521
[4]   Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy [J].
Chien, Yu-Hung ;
Chang, Chin-Chih ;
Sheu, Shey-Huei .
ANNALS OF OPERATIONS RESEARCH, 2010, 181 (01) :723-744
[5]   Optimal spare ordering policy for preventive replacement under cost effectiveness criterion [J].
Chien, Yu-Hung ;
Chen, Jih-An .
APPLIED MATHEMATICAL MODELLING, 2010, 34 (03) :716-724
[6]   A method to minimize the maintenance costs of a broadband access network based on optimal steady-state probability mixture distribution of proactive and reactive maintenance [J].
Deljac, Zeljko ;
Randic, Mirko .
COMPUTERS & ELECTRICAL ENGINEERING, 2022, 102
[7]  
Dohi T, 1998, APPL STOCH MODEL D A, V14, P309, DOI 10.1002/(SICI)1099-0747(199812)14:4<309::AID-ASM351>3.3.CO
[8]  
2-I
[9]   Implementing a bivariate ordering and replacement policy for deteriorating systems with two failure types [J].
Dong, Wenjie ;
Du, Junliang ;
Yang, Mengyue ;
Liu, Sifeng .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (04) :2716-2733
[10]   Scheduling optimal replacement policies for a stochastically deteriorating system subject to two types of shocks [J].
Dong, Wenjie ;
Liu, Sifeng ;
Cao, Yingsai ;
Javed, Saad Ahmed .
ISA TRANSACTIONS, 2021, 112 :292-301