Research on rock breaking characteristics of impact hob of hard rock excavator

被引:3
作者
Lou, Lei [1 ]
Wang, Xiao [2 ]
Wu, Wanrong [3 ]
Qin, Weiye [2 ]
机构
[1] Nanjing Vocat Univ Ind Technol, Sch Mech Engn, Nanjing, Peoples R China
[2] China Tobacco Guizhou Ind Co Ltd, Bijie, Peoples R China
[3] Cent South Univ, Mech & Elect Engn, Changsha, Peoples R China
关键词
hard rock excavation; hob; impact rolling; rock breaking; DISC CUTTER; TBM; DESIGN;
D O I
10.21595/jve.2022.22913
中图分类号
R318 [生物医学工程];
学科分类号
0831 ;
摘要
During hard rock excavation in the process of tunnel construction, the hard rock excavator wears seriously and quickly and reduces its excavation efficiency. Aiming at this problem, this paper proposes a composite rock breaking method by impact rolling and cutting as a solution. In this paper, the composite rock breaking characteristics of impact hob are studied. The impact cutting load of the hob was analyzed, and the hobbing force equation and the rock crushing volume equation were established. The effects of different impact frequencies and impact loads on the cutting force and rock crushing characteristics of the hob were analyzed by experiments. The results show that under a certain thrust and hob spacing, with the increase of the impact frequency, the rock ridge between the two hobs gradually decreases, while the crushed volume of the rock increases gradually. Under the same axial load and cutter spacing conditions, with the increase of the impact frequency, the hob shear force decreases significantly. Under a certain axial load and impact frequency, with the increase of impact load, the crushing volume of rock and the hob shear force decrease significantly. These test results are of great significance for guiding the efficient excavation of hard rock tunnels.
引用
收藏
页码:615 / 629
页数:15
相关论文
共 25 条
[1]   Simultaneous Effects of Joint Spacing and Orientation on TBM Cutting Efficiency in Jointed Rock Masses [J].
Bejari, Hadi ;
Hamidi, Jafar Khademi .
ROCK MECHANICS AND ROCK ENGINEERING, 2013, 46 (04) :897-907
[2]  
Cao Ping, 2017, Journal of Central South University (Science and Technology), V48, P1293, DOI 10.11817/j.issn.1672-7207.2017.05.023
[3]  
[陈冲 Chen Chong], 2018, [黄金科学技术, Gold Science and Technology], V26, P771
[4]   Rock fragmentation under different installation polar angles of TBM disc cutters [J].
Cheng Yong-liang ;
Zhong Jue ;
Mei Yong-bing ;
Xia Yi-min .
JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2017, 24 (10) :2306-2313
[5]  
Cheng Yongliang, 2018, Journal of Mechanical Engineering, V54, P1, DOI 10.3901/JME.2018.01.001
[6]  
[杜立杰 Du Lijie], 2015, [煤炭学报, Journal of China Coal Society], V40, P2974
[7]  
Farrokh E, 2021, TUNN UNDERGR SP TECH, V110, DOI [10.1016/j.tust.204.103829, 10.1016/j.tust.2021.103829]
[8]  
Geng Qi, 2018, Journal of Mechanical Engineering, V54, P36, DOI 10.3901/JME.2018.01.036
[9]  
[龚秋明 Gong Qiuming], 2015, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V37, P54
[10]   Predicting TBM performance in soft sedimentary rocks, case study of Zagros mountains water tunnel projects [J].
Goodarzi, S. ;
Hassanpour, J. ;
Yagiz, S. ;
Rostami, J. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 109