共 50 条
- [41] Improved firefly algorithm with courtship learning for unrelated parallel machine scheduling problem with sequence-dependent setup times JOURNAL OF CLOUD COMPUTING-ADVANCES SYSTEMS AND APPLICATIONS, 2022, 11 (01):
- [42] A Multi-Objective Identical Parallel Machine Scheduling with Setup and Removal Times with Deteriorating and Learning Effects 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 1271 - 1274
- [44] Improved firefly algorithm with courtship learning for unrelated parallel machine scheduling problem with sequence-dependent setup times Journal of Cloud Computing, 11
- [45] Scheduling on unrelated parallel machines with sequence- and machine-dependent setup times and due-date constraints The International Journal of Advanced Manufacturing Technology, 2009, 44 : 1204 - 1212
- [47] Efficient metaheuristic algorithm and re-formulations for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times The International Journal of Advanced Manufacturing Technology, 2015, 76 : 1705 - 1718