Multi-stage process for chemotherapy scheduling and effective capacity determination

被引:4
|
作者
Cataldo, Alejandro [1 ]
Sufan, Sebastian [2 ]
Lorca, Alvaro [1 ,3 ]
Andresen, Max [4 ]
Sanchez, Cesar [5 ]
Saure, Antoine [6 ]
机构
[1] Pontificia Univ Catolica Chile, Sch Engn, Inst Math & Computat Engn, Santiago, Chile
[2] Pontificia Univ Catolica Chile, Sch Engn, Dept Ind & Syst Engn, Santiago, Chile
[3] Pontificia Univ Catolica Chile, Sch Engn, Dept Elect Engn, Santiago, Chile
[4] Pontificia Univ Catolica Chile, Fac Med, Dept Intens Med, Santiago, Chile
[5] Pontificia Univ Catolica Chile, Fac Med, Dept Hematol Oncol, Santiago, Chile
[6] Univ Ottawa, Telfer Sch Management, Ottawa, ON, Canada
关键词
healthcare operations; chemotherapy; patient scheduling; capacity planning; optimization; simulation; PATIENT; TIME; UNCERTAINTY;
D O I
10.1111/itor.13117
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A novel solution approach is developed for the scheduling of chemotherapy sessions at cancer treatment centers. The problem is divided into two subproblems determining the day (interday scheduling) and the time slots (intraday scheduling), respectively. The interday subproblem is solved by a model that allows for effective treatment center capacity choices while the intraday subproblem is addressed using two optimization models. New patient arrivals and treatment protocols specifying the latest starting date and session spacing are sources of uncertainty. Unlike other existing approaches, the proposed method incorporates the concept of effective treatment capacity which facilitates the interaction between the interday and intraday subproblems allowing them to be solved sequentially and iteratively to thus achieve much more resource-efficient solutions. A case study using real data from a Chilean cancer center to conduct comparative simulations of its manual scheduling methods and the proposed methodology found that the latter almost always performed better, often significantly so, on makespan, resource utilization, overtime, and patient diversion metrics.
引用
收藏
页码:151 / 180
页数:30
相关论文
共 50 条
  • [31] Multi-Stage, Multi-Objective Process Optimisation
    Yoseph, Azene. T.
    Rajkumar, Roy
    GECCO-2010 COMPANION PUBLICATION: PROCEEDINGS OF THE 12TH ANNUAL GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2010, : 2063 - 2064
  • [32] PERCEPTION AS A MULTI-STAGE PROCESS: A REIDIAN ACCOUNT
    Folescu, Marina
    JOURNAL OF SCOTTISH PHILOSOPHY, 2021, 19 (01) : 57 - 74
  • [33] Multi-stage vacuum cooling process of cabbage
    Cheng, H. -P.
    Hsueh, C. -F.
    JOURNAL OF FOOD ENGINEERING, 2007, 79 (01) : 37 - 46
  • [34] ELECTROSPINNING PROCESS MODELING: A MULTI-STAGE VIEW
    Zuniga-Navarrete, Christian
    Segura, Stalin Jamil
    Baidya, Sabur
    Narvaez-Munoz, Christian
    Toscano, Juan Diego
    Segura, Luis Javier
    PROCEEDINGS OF ASME 2024 19TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, MSEC2024, VOL 2, 2024,
  • [35] Production capacity planning and control in multi-stage manufacturing
    Gunasekaran, A
    Goyal, SK
    Martikainen, T
    Yli-Olli, P
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (06) : 625 - 634
  • [36] PUMPING CAPACITY OF PITCHED BLADE MULTI-STAGE IMPELLERS
    Jirout, Tomas
    CHEMICAL AND PROCESS ENGINEERING-INZYNIERIA CHEMICZNA I PROCESOWA, 2014, 35 (01): : 47 - 53
  • [37] Getting closer to an effective multi-stage malaria vaccine
    Dobano, Carlota
    Moncunill, Gemma
    Bassat, Quique
    LANCET INFECTIOUS DISEASES, 2024, 24 (10): : 1063 - 1064
  • [38] Multi-Stage Robust Scheduling for Community Microgrid with Energy Storage
    Tang, Ye
    Zhai, Qiaozhu
    Zhao, Jiexing
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2023, 11 (06) : 1923 - 1934
  • [39] Multi-stage Robust Scheduling for Community Microgrid with Energy Storage
    Ye Tang
    Qiaozhu Zhai
    Jiexing Zhao
    JournalofModernPowerSystemsandCleanEnergy, 2023, 11 (06) : 1923 - 1934
  • [40] Integrated optimization of production planning and scheduling for multi-stage workshop
    Zhang, Xiaodong
    Yan, Hongsen
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2005, 41 (09): : 98 - 105