Dynamic opportunistic maintenance grouping in a lot streaming based job-shop scheduling problem

被引:7
|
作者
Abdollahzadeh-Sangroudi, Hadi [1 ,3 ]
Moazzam-Jazi, Elham [2 ]
Tavakkoli-Moghaddam, Reza [2 ]
Ranjbar-Bourani, Mehdi [1 ]
机构
[1] Univ Sci & Technol Mazandaran, Dept Ind Engn, Behshahr, Iran
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
[3] Univ Sci & Technol Mazandaran, Dept Ind Engn, POB 48518-78195, Behshahr, Iran
关键词
Dynamic opportunistic maintenance; Production scheduling; Flexible job-shop; Lot sizing; Mathematical programming; MULTICOMPONENT REPAIRABLE SYSTEM; PREVENTIVE MAINTENANCE; ECONOMIC DEPENDENCE; DECISION-MAKING; OPTIMIZATION; POLICY; RELIABILITY; TIME;
D O I
10.1016/j.cie.2023.109424
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper aims to model maintenance planning with a dynamic opportunistic approach for a job-shop pro-duction system. One issue in such a system is the positive or negative economic dependency. That is grouping maintenance activities may decrease or increase system costs. Furthermore, many maintenance models consider the planning of maintenance only based on a long-term horizon. While short-term and real circumstances such as system characteristics and constraints, workload, number of available maintenance teams, and variable main-tenance cost and time are almost ignored. To address these issues, a rolling-horizon approach based on a long-term maintenance plan is proposed so that subsequent scheduling of maintenance and production activities are performed as events unfold through the time. Hence, we have developed a mixed-integer nonlinear mathematical model to simultaneously make decisions on maintenance selection, maintenance grouping, lot sizing and pro-duction scheduling. The objective function includes the costs of preventive and corrective maintenance activities as well as various production costs such as production and setup, tardiness penalty, and safety stock penalty. A self-adaptive Cuckoo Optimization Algorithm has been used to solve the proposed model. Numerical experiments were conducted to demonstrate the validity of the model and investigate the efficiency and effectiveness of the optimization algorithm.
引用
收藏
页数:28
相关论文
共 50 条
  • [1] An effective heuristic for flexible job-shop scheduling problem with maintenance activities
    Wang, Shijin
    Yu, Jianbo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (03) : 436 - 447
  • [2] Dynamic heuristics for the generalized job-shop scheduling problem
    Ghedjati, Fatima
    Portmann, Marie-Claude
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 2562 - +
  • [3] Solving the integrated lot-sizing and job-shop scheduling problem
    Urrutia, Edwin David Gomez
    Aggoune, Riad
    Dauzere-Peres, Stephane
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (17) : 5236 - 5254
  • [4] Multiobjective Joint Optimization of Production Scheduling and Maintenance Planning in the Flexible Job-Shop Problem
    Ye, Jianfei
    Ma, Huimin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [5] Digital Twin Enhanced Dynamic Job-Shop Scheduling
    Zhang, Meng
    Tao, Fei
    Nee, A. Y. C.
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 58 : 146 - 156
  • [6] A GRASP algorithm for flexible job-shop scheduling with maintenance constraints
    Rajkumar, M.
    Asokan, P.
    Vamsikrishna, V.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (22) : 6821 - 6836
  • [7] Simultaneous Scheduling of Production and Maintenance in a Flexible Job-Shop Workshop
    Bencheikh, Ghita
    Bettayeb, Belgacem
    PROCEEDING OF THE 7TH INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT, GOL 2024, VOL 2, 2024, 1105 : 283 - 292
  • [8] Flexible job shop scheduling with lot streaming and sublot size optimisation
    Bozek, Andrzej
    Werner, Frank
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6391 - 6411
  • [9] A BROADER VIEW OF THE JOB-SHOP SCHEDULING PROBLEM
    WEIN, LM
    CHEVALIER, PB
    MANAGEMENT SCIENCE, 1992, 38 (07) : 1018 - 1033
  • [10] Scheduling of Dynamic Multi-Objective Flexible Enterprise Job-Shop Problem Based on Hybrid QPSO
    Chen, Wei
    Yang, Hong
    Hao, Yifei
    IEEE ACCESS, 2019, 7 : 127090 - 127097