Solution of discrete time-cost trade-off problem with adaptive search domain

被引:4
|
作者
Bettemir, Onder Halis [1 ]
Birgonul, M. Talat [2 ]
机构
[1] Inonu Univ, Dept Civil Engn, Malatya, Turkiye
[2] Middle East Tech Univ, Dept Civil Engn, Ankara, Turkiye
关键词
Project scheduling; Differential evolution; Meta-heuristic algorithm; Time-cost trade-off problem; Optimization; Ultraploidy; CONSTRUCTION TIME; GENETIC ALGORITHM; DIFFERENTIAL EVOLUTION; OPTIMIZATION; MODEL; COMPRESSION;
D O I
10.1108/ECAM-06-2022-0601
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeExact solution of time-cost trade-off problem (TCTP) by the state-of-the-art meta-heuristic algorithms can be obtained for small- and medium-scale problems, while satisfactory results cannot be obtained for large construction projects. In this study, a hybrid heuristic meta-heuristic algorithm that adapts the search domain is developed to solve the large-scale discrete TCTP more efficiently.Design/methodology/approachMinimum cost slope-based heuristic network analysis algorithm (NAA), which eliminates the unfeasible search domain, is embedded into differential evolution meta-heuristic algorithm. Heuristic NAA narrows the search domain at the initial phase of the optimization. Moreover, activities with float durations higher than the predetermined threshold value are eliminated and then the meta-heuristic algorithm starts and searches the global optimum through the narrowed search space. However, narrowing the search space may increase the probability of obtaining a local optimum. Therefore, adaptive search domain approach is employed to make reintroduction of the eliminated activities to the design variable set possible, which reduces the possibility of converging into local minima.FindingsThe developed algorithm is compared with plain meta-heuristic algorithm with two separate analyses. In the first analysis, both algorithms have the same computational demand, and in the latter analysis, the meta-heuristic algorithm has fivefold computational demand. The tests on case study problems reveal that the developed algorithm presents lower total project costs according to the dependent t-test for paired samples with alpha = 0.0005.Research limitations/implicationsIn this study, TCTP is solved without considering quality or restrictions on the resources.Originality/valueThe proposed method enables to adapt the number of parameters, that is, the search domain and provides the opportunity of obtaining significant improvements on the meta-heuristic algorithms for other engineering optimization problems, which is the theoretical contribution of this study. The proposed approach reduces the total construction cost of the large-scale projects, which can be the practical benefit of this study.
引用
收藏
页码:1032 / 1052
页数:21
相关论文
共 50 条
  • [21] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [22] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [23] Solving Stochastic Time-Cost Trade-Off Problems via Modified Double-Loop Procedure with Adaptive Domain Decomposition Method
    Wang, Jia
    Huang, Wei
    Chen, Yahan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (02)
  • [24] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [25] Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
    Anagnostopoulos, K. P.
    Kotsikas, L.
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (01) : 260 - 270
  • [26] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [27] Efficient modeling of time-cost trade-off problem by eliminating redundant paths
    Ammar, Mohammad A.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 812 - 821
  • [28] Time-cost trade-off analysis of project networks in fuzzy environments
    Chen, Shih-Pin
    Tsai, Ming-Jiun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (02) : 386 - 397
  • [29] A comparative study of modeling and solution approaches for the multi-mode resource-constrained discrete time-cost trade-off problem: Case study of an ERP implementation project
    Cakir, Gizem
    Subulan, Kemal
    Yildiz, Seyda Topaloglu
    Hamzadayi, Alper
    Asilkefeli, Ceren
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [30] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262