Proportionate shop;
Complexity;
Scheduling;
Makespan;
Maximum lateness;
Mean finish time;
Just-in-time;
D O I:
10.1007/s11590-023-02000-0
中图分类号:
C93 [管理学];
O22 [运筹学];
学科分类号:
070105 ;
12 ;
1201 ;
1202 ;
120202 ;
摘要:
In this paper, we present NP-hardness proofs and exhibit linear-time algorithms for proportionate two-machine open shop and job shop problems with respect to the maximum lateness, the makespan with release dates, the total weighted completion times and the number of just-in-time jobs.