The bidding strategy for renewable energy auctions under government subsidies

被引:6
作者
Wang, Zhen [1 ]
Lam, Jasmine Siu Lee [2 ]
Huo, Jiazhen [3 ]
机构
[1] Shandong Univ Finance & Econ, Int Sch Low Carbon Studies, Shandong 250014, Peoples R China
[2] Tech Univ Denmark, Dept Technol Management & Econ, Kongens Lyngby, Denmark
[3] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Bidding strategy; Renewable energy auctions; Government subsidies; Incomplete information; GENERATION;
D O I
10.1016/j.apenergy.2023.122148
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Investing in renewable energy is the inevitable path to achieving energy transition. To promote renewable energy investment, many countries have subsidized renewable energy generation alongside auction mechanisms. The bidding strategy for renewable energy auctions under different forms of government subsidies is not well studied. Based on the constructed preemption game model, this paper studies the bidding strategy for renewable energy auctions under government subsidies and further discusses the impact of different subsidy forms on the investor's bidding strategy. Our results demonstrate that with incomplete information on competitors' investment income or investment cost, an investor can refer to the bidding strategy without competitors to guide decisions. In addition, the higher the government subsidy, the lower the bidding price of the investor. In the fixed amount subsidy form, the most critical factor influencing the bidding strategy is the annual power production after the project investment.
引用
收藏
页数:8
相关论文
共 19 条
[1]   No real option for solar in Ireland: A real option valuation of utility scale solar investment in Ireland [J].
Assereto, Martina ;
Byrne, Julie .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 143
[2]   Developing real option game models [J].
Azevedo, Alcino ;
Paxson, Dean .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (03) :909-920
[3]   Imperfect Competition in Electricity Markets with Renewable Generation: The Role of Renewable Compensation Policies [J].
Brown, David P. ;
Eckert, Andrew .
ENERGY JOURNAL, 2020, 41 (04) :61-88
[4]   Alberta?s Renewable Electricity Program: Design, results, and lessons learned* [J].
Hastings-Simon, Sara ;
Leach, Andrew ;
Shaffer, Blake ;
Weis, Tim .
ENERGY POLICY, 2022, 171
[5]  
International Renewable Energy Agency (IRENA), 2019, development of heat and power generation using renewable
[6]   Methodology to prepare for UK's offshore wind Contract for Difference auctions [J].
Kell, Nicholas P. ;
Santibanez-Borda, Ernesto ;
Morstyn, Thomas ;
Lazakis, Iraklis ;
Pillai, Ajit C. .
APPLIED ENERGY, 2023, 336
[7]   Real options and preemption under incomplete information [J].
Lambrecht, B ;
Perraudin, W .
JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 2003, 27 (04) :619-643
[8]   Designing effective auctions for renewable energy support [J].
Matthaeus, David .
ENERGY POLICY, 2020, 142
[9]   THE VALUE OF WAITING TO INVEST [J].
MCDONALD, R ;
SIEGEL, D .
QUARTERLY JOURNAL OF ECONOMICS, 1986, 101 (04) :707-727
[10]   Optimal federal co-regulation of renewable energy deployment [J].
Meier, Jan-Niklas ;
Lehmann, Paul .
RESOURCE AND ENERGY ECONOMICS, 2022, 70