Approach for Installation and Logistics of a Floating Offshore Wind Farm

被引:15
作者
Diaz, Hugo [1 ]
Soares, C. Guedes [1 ]
机构
[1] Univ Lisbon, Ctr Marine Technol & Ocean Engn CENTEC, Inst Super Tecn, P-1049001 Lisbon, Portugal
关键词
floating wind farm design; offshore wind farm installation; offshore wind logistics; techno-economic analysis; ENERGY; RESOURCE; MODEL;
D O I
10.3390/jmse11010053
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
An approach is developed for floating wind farm installation by creating a model that allows the planning of the main logistics and installation aspects of a floating wind farm. The method aims to preserve the coherency between logistic methods and project performance, as floating wind farm installation is a complex problem, due to the number of components that impose specific constraints in areas such as transportation and manufacturing. The planning tool is developed based on the knowledge about how to use the various approaches and on the analysis of different logistical solutions. A techno-economic view of the logistics and installation involved in the floating wind farm design is the main objective of this study. A case study for the CENTEC TLP concept implemented in Spanish and Irish waters is performed. Case study findings reveal the major aspects that affect the design and logistics factors. The tool is developed for the main types of floating wind platforms and is applicable for the preliminary design of wind farms worldwide. The tool suggests a strategy of design and logistic aspects dependent on a few inputs such as the number of components for installation, distances and the maximum number of turbines. These findings are especially important for the new floating wind farms being positioned further offshore.
引用
收藏
页数:27
相关论文
共 83 条
[1]  
Ait-Alla A., 2013, INT J ENERGY, V7, P23
[2]   Fostering Offshore Wind Integration in Europe through Grid Connection Impact Assessment [J].
Amaro, Nuno ;
Egorov, Aleksandr ;
Gloria, Goncalo .
JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (04)
[3]  
[Anonymous], 2017, DNVGLST0054
[4]  
[Anonymous], ARCWIND PROJECT ARCW
[5]  
[Anonymous], 2016, Planning and Executation of Marine Operations
[6]   Strategic Optimization of Offshore Wind Farm Installation [J].
Backe, Stian ;
Haugland, Dag .
COMPUTATIONAL LOGISTICS, ICCL 2017, 2017, 10572 :285-299
[7]   An Economic Analysis of An Innovative Floating Offshore Wind Platform Built with Concrete: The SATH® Platform [J].
Baita-Saavedra, Eugenio ;
Cordal-Iglesias, David ;
Filgueira-Vizoso, Almudena ;
Morato, Alex ;
Lamas-Galdo, Isabel ;
Alvarez-Feal, Carlos ;
Carral, Luis ;
Castro-Santos, Laura .
APPLIED SCIENCES-BASEL, 2020, 10 (11)
[8]   Economic Aspects of a Concrete Floating Offshore Wind Platform in the Atlantic Arc of Europe [J].
Baita-Saavedra, Eugenio ;
Cordal-Iglesias, David ;
Filgueira-Vizoso, Almudena ;
Castro-Santos, Laura .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (21)
[9]  
Barlow E., 2017, USING SIMULATION MOD
[10]   Exploring the impact of innovative developments to the installation process for an offshore wind farm [J].
Barlow, Euan ;
Oeztuerk, Diclehan Tezcaner ;
Revie, Matthew ;
Boulougouris, Evangelos ;
Day, Alexander H. ;
Akartunali, Kerem .
OCEAN ENGINEERING, 2015, 109 :623-634