Integrative approach for optimizing construction and demolition waste management practices in developing countries

被引:1
|
作者
Abulebdah, Abeer [1 ]
Musharavati, Farayi [1 ]
Fares, Enas
机构
[1] Qatar Univ, Dept Mech & Ind Engn, POB 2713, Doha, Qatar
来源
SUSTAINABLE ENVIRONMENT | 2024年 / 10卷 / 01期
关键词
Waste management; construction and demolition waste (C&DW); geographic information system (GIS); waste flow dashboard; fuzzy analytical hierarchy process (F-AHP); optimization; MODEL; SUSTAINABILITY; TECHNOLOGIES; METHODOLOGY; GENERATION; BUILDINGS; CONCRETE; REGION; QATAR;
D O I
10.1080/27658511.2024.2319905
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to the numerous infrastructure development projects taking place in developing nations, large amounts of construction and demolition waste (C&DW) are unavoidable. Most C&DW management strategies, however, involve 'isolated' operations with high overhead. Waste data transfers are difficult to watch over. Important information needed for decision-making is, therefore, challenging to obtain. This paper's goal is to discuss C&DW management from an integrative standpoint. Using GIS functions and a fuzzy analytical hierarchy approach, the best sites for waste management facilities can be found. A mixed integer optimization model is created to identify optimal location and allocation of waste management facilities. The objective is to reduce waste collection costs under different operational scenarios. By incorporating 'constructs elements' and 'connected elements' that are linked, isolated C&DW management ventures are transformed into successful C&DW management ventures. The effectiveness and efficiency of waste management strategies are evaluated using GIS analysis. A dashboard for tracking waste data flows is created to show how stakeholder decision making can be made easier. The proposed integrative approach differs from other approaches since it re-purposes location-allocation models and GIS data to optimize 'isolated' C&DW management practices. In addition, the notion of 'construct elements' that can be time-shared is outlined. Moreover, the notion of 'connected elements' that are dynamic, time-limited, and yet transient enough to provide the necessary interconnectivity is developed to support and complement the seamless function of a network of C&DW management facilities. The usefulness of the integrative approach is illustrated by a case study. Analysis of case studies demonstrates that waste management strategies in developing countries can be made more effective and waste collection efficiency can be increased. According to comparative studies, updating current waste management facilities can cut operating costs by 26%, while implementing an integrative strategy can cut costs by 52%. The discussions in this paper can help towns reevaluate C&DW management and put useful, unified C&DW management techniques into practice.
引用
收藏
页数:21
相关论文
共 50 条
  • [21] Strategies to promote construction and demolition waste management in the context of local dynamics
    Ramos, Mario
    Martinho, Graca
    Pina, Joaquim
    WASTE MANAGEMENT, 2023, 162 : 102 - 112
  • [22] Construction and demolition waste management in Jordan: a multifaceted perspective
    Alshdiefat, Ala'a Saleh
    Sharif, Ahlam Ammar
    Alharahsheh, Albara' Ibrahim
    Albrka, Shaban Ismael
    Olsson, Nils O. E.
    Younes, Mohammad
    Bang, Sofie
    CONSTRUCTION INNOVATION-ENGLAND, 2025, 25 (02): : 290 - 305
  • [23] A conceptual foundation for effective construction and demolition waste management
    Kabirifar, Kamyar
    Mojtahedi, Mohammad
    Wang, Cynthia Changxin
    Tam, Vivian W. Y.
    CLEANER ENGINEERING AND TECHNOLOGY, 2020, 1
  • [24] A mini review of construction and demolition waste management in India
    Faruqi, M. Humam Zaim
    Siddiqui, Faisal Zia
    WASTE MANAGEMENT & RESEARCH, 2020, 38 (07) : 708 - 716
  • [25] CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT IN THE UAE: APPLICATION AND OBSTACLES
    Mawed, Mahmoud
    Al Nuaimi, Mohamed Samir
    Kashawni, Ghanim
    INTERNATIONAL JOURNAL OF GEOMATE, 2020, 18 (70): : 235 - 245
  • [26] Barriers to improving construction and demolition waste management in Bangladesh
    Hasan, Md Raquibul
    Sagar, Md Samiul Islam
    Ray, Bhadro Chandro
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (14) : 2333 - 2347
  • [27] Construction and demolition waste best management practice in Europe
    Galvez-Martos, Jose-Luis
    Styles, David
    Schoenberger, Harald
    Zeschmar-Lahl, Barbara
    RESOURCES CONSERVATION AND RECYCLING, 2018, 136 : 166 - 178
  • [28] LCA on Construction and Demolition Waste Management Approaches: A review
    Devaki, H.
    Shanmugapriya, S.
    MATERIALS TODAY-PROCEEDINGS, 2022, 65 : 764 - 770
  • [29] Recommendations for the management of construction and demolition waste in treatment plants
    Barbudo, Auxi
    Ayuso, Jesus
    Lozano, Angelica
    Cabrera, Manuel
    Lopez-Uceda, Antonio
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (01) : 125 - 132
  • [30] Optimizing construction and demolition waste management in Nigeria: challenges, regulatory frameworks, and policy solutions
    H. C. O. Unegbu
    D. S. Yawas
    Discover Civil Engineering, 1 (1):