Risk assessment in Iranian oil and gas construction industry: a process approach

被引:6
|
作者
Sohrabi, Hossein [1 ]
Noorzai, Esmatullah [2 ]
机构
[1] Pars Univ Architecture & Art, Dept Project & Construct Management, Tehran, Iran
[2] Univ Tehran, Dept Project & Construct Management, Tehran, Iran
关键词
Risk management; Construction industry; Claim; Process groups; Oil and gas projects; CONTRACTORS CLAIMS; DELAY CAUSES; MANAGEMENT; PROJECTS; SYSTEM;
D O I
10.1108/IJQRM-03-2021-0069
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose Successful risk management is influential in different phases of construction projects. It can play a critical role in reducing the possibility of claims as well as related disputes. The risk management knowledge area in large capital projects such as oil and gas is considered a questionable problem in the construction industry. The present study makes an effort to identify the importance of process groups in improving risk management performance. Design/methodology/approach This study is selected and ranked 36 factors leading to the claim in Iran's oil and gas industry through the Delphi method and a questionnaire. Factors categorized into a risk breakdown structure (RBS) include eight groups. Factors are linked to one of the process groups by a Delphi method. Finally, the relationship between RBS and the five process groups is analyzed using partial least squares structural equation modeling (PLS-SEM). Findings Findings showed that the planning process group had more confirmed factors than others. Most of the supported communications belonged to the contractor and the owner parties. Also, the cause of delay in the implementation phase due to the contractor performance had a higher relative importance index. Originality/value This article, from a project life-cycle perspective, considers the new structure between the risks leading to claims and the key parties to the project. It can be a good criterion for identifying risks and a timelier response to them before the risks turn into disagreements.
引用
收藏
页码:124 / 147
页数:24
相关论文
共 50 条
  • [41] Impact assessment of high-risk analytes in produced water from oil and gas industry
    Nsiah, Francis
    Tulashie, Samuel Kofi
    Miyittah, Michael
    Nuamah, Francis
    Tsyawo, Francis Worlanyo
    MARINE POLLUTION BULLETIN, 2023, 191
  • [42] Tailoring Psychosocial Risk Assessment in the Oil and Gas Industry by Exploring Specific and Common Psychosocial Risks
    Bergh, Linn Iren Vestly
    Leka, Stavroula
    Zwetsloot, Gerard I. J. M.
    SAFETY AND HEALTH AT WORK, 2018, 9 (01) : 63 - 70
  • [43] A Scoping Review of Technologies and Their Applicability for Exposome-Based Risk Assessment in the Oil and Gas Industry
    Kuijpers, Eelco
    van Wel, Luuk
    Loh, Miranda
    Galea, Karen S.
    Makris, Konstantinos C.
    Stierum, Rob
    Fransman, Wouter
    Pronk, Anjoeka
    ANNALS OF WORK EXPOSURES AND HEALTH, 2021, 65 (09) : 1011 - 1028
  • [44] Bayesian acyclic network based environmental footprint risk assessment system for oil and gas industry
    Philip A.C.
    Ginters E.
    Basdogan D.
    International Journal of Circuits, Systems and Signal Processing, 2021, 15 : 913 - 927
  • [45] Scenario-based risk assessment of TENORM waste disposal options in oil and gas industry
    ALNabhani, Khalid
    Khan, Faisal
    Yang, Ming
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2016, 40 : 55 - 66
  • [46] Occupational Risk Assessment: Review of Wooden Scaffold Board Application in Malaysian Oil and Gas Industry
    Wahab, Mohd Jamil Abdul
    Abd Rashid, Noor Azrieda
    Ujang, Salmiah
    Choon, Lim Seng
    SAINS MALAYSIANA, 2016, 45 (07): : 1139 - 1147
  • [47] Radiological impact on man and the environment from the oil and gas industry:: Risk assessment for the critical group
    Steinhäusler, F
    RADIATION SAFETY PROBLEMS IN THE CASPIAN REGION, 2004, 41 : 129 - 134
  • [48] RELIABILITY ASSESSMENT OF SAFETY INSTRUMENTED SYSTEMS IN THE OIL AND GAS INDUSTRY: A PRACTICAL APPROACH AND A CASE STUDY
    Lundteigen, Mary Ann
    Rausand, Marvin
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2009, 16 (02) : 187 - 212
  • [49] A Framework for Project Risk Assessment in Dynamic Networks: A Case Study of Oil and Gas Megaproject Construction
    Farahani, Amir Farmahini
    Khalili-Damghani, Kaveh
    Didehkhani, Hossain
    Sarfaraz, Amir Homayoun
    Hajirezaie, Mehdi
    IEEE Access, 2021, 9 : 88767 - 88781
  • [50] Risk Assessment of Long Gas and Oil Pipeline Projects Inducing Landslide Disasters during Construction
    Bai, Mingzhou
    Du, Yanqing
    Chen, Yun
    Xing, Yujian
    Zhao, Pingyuan
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (05)