Risk assessment in Iranian oil and gas construction industry: a process approach

被引:6
|
作者
Sohrabi, Hossein [1 ]
Noorzai, Esmatullah [2 ]
机构
[1] Pars Univ Architecture & Art, Dept Project & Construct Management, Tehran, Iran
[2] Univ Tehran, Dept Project & Construct Management, Tehran, Iran
关键词
Risk management; Construction industry; Claim; Process groups; Oil and gas projects; CONTRACTORS CLAIMS; DELAY CAUSES; MANAGEMENT; PROJECTS; SYSTEM;
D O I
10.1108/IJQRM-03-2021-0069
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose Successful risk management is influential in different phases of construction projects. It can play a critical role in reducing the possibility of claims as well as related disputes. The risk management knowledge area in large capital projects such as oil and gas is considered a questionable problem in the construction industry. The present study makes an effort to identify the importance of process groups in improving risk management performance. Design/methodology/approach This study is selected and ranked 36 factors leading to the claim in Iran's oil and gas industry through the Delphi method and a questionnaire. Factors categorized into a risk breakdown structure (RBS) include eight groups. Factors are linked to one of the process groups by a Delphi method. Finally, the relationship between RBS and the five process groups is analyzed using partial least squares structural equation modeling (PLS-SEM). Findings Findings showed that the planning process group had more confirmed factors than others. Most of the supported communications belonged to the contractor and the owner parties. Also, the cause of delay in the implementation phase due to the contractor performance had a higher relative importance index. Originality/value This article, from a project life-cycle perspective, considers the new structure between the risks leading to claims and the key parties to the project. It can be a good criterion for identifying risks and a timelier response to them before the risks turn into disagreements.
引用
收藏
页码:124 / 147
页数:24
相关论文
共 50 条
  • [21] Assessment of operational risks in the oil and gas industry
    Bogopolsky, Vadim O.
    Bagirov, Azad A.
    Shirinov, Magomed M.
    NAFTA-GAZ, 2024, (08):
  • [22] Hazard identification and risk assessment with controls (Hirac) in oil industry ? A proposed approach
    Iqbal, Mohammed Ismail
    Isaac, Osama
    Rajawy, Ibrahim Al
    Khuthbuddin, Shamsuddin
    Ameen, Ali
    MATERIALS TODAY-PROCEEDINGS, 2021, 44 : 4898 - 4902
  • [23] An environmental risk assessment framework for enhanced oil recovery solutions from offshore oil and gas industry
    Vora, Mehul
    Sanni, Steinar
    Flage, Roger
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2021, 88
  • [24] Quantitative risk assessment methodology of installation process for deepwater oil and gas equipment
    Cai, Baoping
    Zhao, Liqian
    Liu, Yiliu
    Zhang, Yanping
    Li, Wenchao
    Shao, Xiaoyan
    Zhao, Yi
    Liu, Zengkai
    Ji, Renjie
    Liu, Yonghong
    JOURNAL OF CLEANER PRODUCTION, 2022, 341
  • [25] Dynamic risk assessment methodology of operation process for deepwater oil and gas equipment
    Wang, Chenyushu
    Cai, Baoping
    Shao, Xiaoyan
    Zhao, Liqian
    Sui, Zhongfei
    Liu, Keyang
    Khan, Javed Akbar
    Gao, Lei
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 239
  • [26] AN ECONOMIC AND MATHEMATICAL MODELING FOR RISK ASSESSMENT OF INNOVATIVE ACTIVITIES AN ENTERPRISE IN OIL AND GAS INDUSTRY
    Mammadov, M.A.
    Yadigarov, T.A.
    Mammadova, F.A.
    Alizade, Sh.I.
    Nagdiyev, O.A.
    Safarova, G.N.
    Aliyev, A.M.
    SOCAR Proceedings, 2024, (04): : 139 - 146
  • [27] REAL-TIME DATA FOR RISK ASSESSMENT IN THE OFFSHORE OIL&GAS INDUSTRY
    Paltrinieri, Nicola
    Landucci, Gabriele
    Rossi, Pierluigi Salvo
    PROCEEDINGS OF THE ASME 36TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2017, VOL 3B, 2017,
  • [28] Risk Assessment and Prevention in Oil-gas Exploration Industry: the Tarim Basin as the Case
    Zhan Li
    Yang Changming
    Hu Shan
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 257 - 262
  • [29] RISK ASSESSMENT IN OIL AND GAS INDUSTRY USING SIMULATION AND BOW-TIE ANALYSIS
    Kbah, Zaid
    Erdil, Nadiye O.
    Aqlan, Faisal
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2020, 27 (01): : 110 - 123
  • [30] Risk assessment model selection in construction industry
    KarimiAzari, AmirReza
    Mousavi, Neda
    Mousavi, S. Farid
    Hosseini, SeyedBagher
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (08) : 9105 - 9111