Automatic lift path planning of prefabricated building components using semantic BIM, improved A* and GA

被引:1
|
作者
Chen, Keyu [1 ]
You, Beiyu [1 ]
Zhang, Yanbo [1 ]
Chen, Zhengyi [2 ]
机构
[1] Hainan Univ, Sch Civil Engn & Architecture, Haikou, Peoples R China
[2] Hong Kong Univ Sci & Technol, Hong Kong, Peoples R China
关键词
Building information modeling (BIM); Component lifting; Improved A* algorithm; Prefabricated buildings; ALGORITHM; PERFORMANCE; DESIGN;
D O I
10.1108/ECAM-11-2023-1119
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposePrefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).Design/methodology/approachFirstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements' rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.FindingsThe proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.Originality/valueIn this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.
引用
收藏
页数:25
相关论文
共 50 条
  • [21] Improved Automatic Keyphrase Extraction by Using Semantic Information
    Wang, XiaoLing
    Mu, DeJun
    Fang, Jun
    INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL 1, PROCEEDINGS, 2008, : 1061 - 1065
  • [22] Forecasting Time between Problems of Building Components by Using BIM
    Matsubayashi, Michio
    Watanabe, Shun
    CAADENCE IN ARCHITECTURE: BACK TO COMMAND, 2016, : 87 - 92
  • [23] Building Information Modelling- (BIM-) Based Generative Design for Drywall Installation Planning in Prefabricated Construction
    Lobo, Jose Daniel Cuellar
    Lei, Zhen
    Liu, Hexu
    Li, Hong Xian
    Han, SangHyeok
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [24] A MODEL FOR SPATIAL PLANNING OF SITE AND BUILDING USING BIM METHODOLOGY
    Ustinovichius, Leonas
    Peckiene, Aurelija
    Popov, Vladimir
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (02) : 173 - 182
  • [25] A Semantic Approach to Dynamic Path Planning for Fire Evacuation through BIM and IoT Data Integration
    Pang, Bo
    Shi, Jianyong
    Jiang, Liu
    Pan, Zeyu
    ADVANCES IN CIVIL ENGINEERING, 2024, 2024
  • [26] Automatic Positioning and Tool Path Planning of Ultra-large-scale Components
    Wu, Jiafeng
    Gao, Dong
    Yao, Yingxue
    MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 277 - 280
  • [27] Semantic Enrichment of a BIM Model Using Revit: Automatic Annotation of Doors in High-Rise Residential Building Models Using Machine Learning
    Bigdeli, Soheila
    Pauwels, Pieter
    Verstockt, Steven
    van de Weghe, Nico
    Merci, Bart
    FIRE TECHNOLOGY, 2024,
  • [28] Integer GA for Mobile Robot Path Planning with using another GA as repairing function
    Mansouri, M.
    Shoorehdeli, M. Aliyari
    Teshnehlab, M.
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 135 - 140
  • [29] Automatic Parking Path Planning of Tracked Vehicle Based on Improved A* and DWA Algorithms
    Yang, Haixu
    Xu, Xiaoming
    Hong, Jichao
    IEEE TRANSACTIONS ON TRANSPORTATION ELECTRIFICATION, 2023, 9 (01) : 283 - 292
  • [30] Alternatives for facilitating automatic transformation of BIM data using semantic query languages
    Costa, G.
    Sicilia, A.
    AUTOMATION IN CONSTRUCTION, 2020, 120 (120)