Automatic lift path planning of prefabricated building components using semantic BIM, improved A* and GA

被引:1
|
作者
Chen, Keyu [1 ]
You, Beiyu [1 ]
Zhang, Yanbo [1 ]
Chen, Zhengyi [2 ]
机构
[1] Hainan Univ, Sch Civil Engn & Architecture, Haikou, Peoples R China
[2] Hong Kong Univ Sci & Technol, Hong Kong, Peoples R China
关键词
Building information modeling (BIM); Component lifting; Improved A* algorithm; Prefabricated buildings; ALGORITHM; PERFORMANCE; DESIGN;
D O I
10.1108/ECAM-11-2023-1119
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposePrefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).Design/methodology/approachFirstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements' rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.FindingsThe proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.Originality/valueIn this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.
引用
收藏
页数:25
相关论文
共 50 条
  • [1] Destruction Feature Extraction of Prefabricated Residential Building Components Based on BIM
    Zhao, Peili
    Liu, Xiaohong
    Liang, Zhisheng
    SCIENTIFIC PROGRAMMING, 2022, 2022
  • [2] A BIM-Based Approach to Automated Prefabricated Building Construction Site Layout Planning
    Yang, Bin
    Fang, Tengwei
    Luo, Xiaoqun
    Liu, Boda
    Dong, Miaosi
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (04) : 1535 - 1552
  • [3] A BIM-Based Approach to Automated Prefabricated Building Construction Site Layout Planning
    Bin Yang
    Tengwei Fang
    Xiaoqun Luo
    Boda Liu
    Miaosi Dong
    KSCE Journal of Civil Engineering, 2022, 26 : 1535 - 1552
  • [4] Improved Path Planning of the Blade for an Automatic Spinach Harvester
    Takayama, Naoto
    Yamaguchi, Tatsuya
    Fujisawa, Akihiro
    Kamijo, Tomokazu
    Nakajima, Koki
    Seki, Yoshifumi
    Hayashi, Haruki
    Chida, Yuichi
    IFAC PAPERSONLINE, 2020, 53 (02): : 15816 - 15823
  • [5] An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM
    Ren, Shaoqing
    Qiang, Guofeng
    Tang, Shu
    Zhang, Cheng
    Seo, Hyung-Joon
    Wu, Keyao
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024, 20 (02) : 287 - 302
  • [6] Building information modeling indoor path planning: A lightweight approach for complex BIM building
    Liu, Xiaojun
    He, Changyan
    Zhao, Hantao
    Jia, Jinyuan
    Liu, Chang
    COMPUTER ANIMATION AND VIRTUAL WORLDS, 2021, 32 (3-4)
  • [7] Automatic Quality Inspection and Intelligent Prevention of Prefabricated Building Construction Based on BIM and Fuzzy Logic
    Ma W.
    Decision Making: Applications in Management and Engineering, 2024, 7 (02): : 65 - 80
  • [8] Connecting building component catalogues with BIM models using semantic technologies: an application for precast concrete components
    Costa, G.
    Madrazo, L.
    AUTOMATION IN CONSTRUCTION, 2015, 57 : 239 - 248
  • [9] Path planning using improved A* algorithm
    Tang, XJ
    Tao, HJ
    Fan, AL
    ACTIVE MEDIA TECHNOLOGY, 2003, : 490 - 495
  • [10] A BIM-based semantic approach for fund-allocation of building components
    Mohamed, Ahmed Gouda
    Marzouk, Mohamed
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2024, 20 (03) : 471 - 493