Principles of cellular manufacturing/engineering/management: case studies and explications

被引:0
作者
Schonberger, Richard [1 ]
机构
[1] 177 107th Ave NE, 1702, Bellevue, WA 98004 USA
关键词
Cellular manufacturing; Workcells; Flexibly quick response; Pull system; One-piece flow; Visual Management; SUPPLY CHAIN INTEGRATION; MANAGEMENT; IMPLEMENTATION; ONTOLOGY; SYSTEMS;
D O I
10.4995/ijpme.2023.19426
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Process improvement through cellular manufacturing, engineering, and management (CEM) is largely dated and neglected. This article aims at rejuvenating the topic through re-conceptualization in the form of twelve principles of workcell design, operation, and management, plus six corollary principles. An assessment model, based on the twelve principles is suggested for planning and evaluating proposed or operational CEM cases. Much of the attendant research emerges from published case studies, along with authors' own extensive, on site visitations and analyses. Collectively, an intent to present rationale for considering and treating the workcell/ cellular construct as among the more significant concepts/methodologies within the field of manufacturing/ engineering/production management.
引用
收藏
页码:103 / 112
页数:10
相关论文
共 66 条
[1]   Operations flow effectiveness: a systems approach to measuring flow performance [J].
Afy-Shararah, Mohamed ;
Rich, Nicholas .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2018, 38 (11) :2096-2123
[2]  
Barry M, 2016, CELLULAR MANUFACTURI
[3]  
Bicheo J., 2023, THE LEAN TOOLBOX, Vsixth
[4]  
Burbidge J.L., 1989, PRODUCTION FLOW ANAL
[5]  
Burbidge JL., 1975, INTRO GROUP TECHNOLO
[6]   Advanced manufacturing technologies and strategically flexible production [J].
Cagliano, R ;
Spina, G .
JOURNAL OF OPERATIONS MANAGEMENT, 2000, 18 (02) :169-190
[7]   Organization and problem ontology for supply chain information support system [J].
Chandra, Charu ;
Tumanyan, Armen .
DATA & KNOWLEDGE ENGINEERING, 2007, 61 (02) :263-280
[8]   Supply chain integration, risk management and manufacturing flexibility [J].
Chaudhuri, Atanu ;
Boer, Harry ;
Taran, Yariv .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2018, 38 (03) :690-712
[9]   Rapid response manufacturing through a rapidly reconfigurable robotic workcell [J].
Chen, IM .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2001, 17 (03) :199-213
[10]  
DiBono P, 1997, IIE SOLUTIONS, V29, P24