Optimization of construction site layout using BIM generative design

被引:7
|
作者
Salah, Mona [1 ]
Elbeltagi, Emad [2 ]
Elsheikh, Asser [2 ,3 ]
机构
[1] Horus Univ, Dept Civil Engn, Dumyat, Egypt
[2] Mansoura Univ, Struct Engn Dept, Mansoura, Egypt
[3] PeoplesFriendship Univ Russia RUDN, Dept Civil Engn, Moscow, Russia
关键词
Temporary facilities; site layout planning; construction site; building information modelling; generative design; visual programming; NOISE-POLLUTION; MODEL; FACILITIES; FRAMEWORK;
D O I
10.1080/15623599.2023.2222997
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction site layout planning (CSLP) is the process of allocating temporary facilities needed on construction site. It is a complex process that aims at minimizing travel distances while improving productivity and safety. Although previous studies have enhanced the CSLP, there is a lack of studies that benefit from the potential of Building Information Modelling (BIM)-Generative Design (GD) integration in the field of site layout planning. This study aims to understand the CSLP problem from new aspects to facilitate its use for construction practitioners and site planners. The research presents a new modelling and optimization concept that utilizes BIM-GD tool to target optimum construction site layout plans to ensure a safe and productive work environment. The developed model applies the parametric visual programming basics (VP) to build the layout problem for optimization. The research includes a case study from the literature to demonstrate the applicability of the proposed model. The results show a high validity for the model compared with previous models in terms of defining the problem from new aspects and applying all the calculations within the BIM environment software. The presented study shows great potential from the GD tool for more practical and complex applications in future research.
引用
收藏
页码:314 / 322
页数:9
相关论文
共 50 条
  • [41] GIS-based dynamic construction site material layout evaluation for building renovation projects
    Su, Xing
    Andoh, Abdul Rahman
    Cai, Hubo
    Pan, Jing
    Kandil, Amr
    Said, Hisham M.
    AUTOMATION IN CONSTRUCTION, 2012, 27 : 40 - 49
  • [42] Reducing Construction Dust Pollution by Planning Construction Site Layout
    Tao, Guowu
    Feng, Jingchun
    Feng, Haibo
    Feng, Hui
    Zhang, Ke
    BUILDINGS, 2022, 12 (05)
  • [43] Automated generative design and prefabrication of precast buildings using integrated BIM and graph convolutional neural network
    Li, Kexin
    Gan, Vincent J. L.
    Li, Mingkai
    Gao, Maggie Y.
    Tiong, Robert L. K.
    Yang, Yaowen
    DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2024, 18
  • [44] Construction Site Layout Planning Using Multiple-Level Simulated Annealing
    Jiang, Hui
    Miao, YaBo
    INTELLIGENT COMPUTING, VOL 2, 2021, 284 : 398 - 407
  • [45] Optimisation of construction site layout using a hybrid simulation-based system
    Zhou, F.
    AbouRizk, S. M.
    Al-Battaineh, H.
    SIMULATION MODELLING PRACTICE AND THEORY, 2009, 17 (02) : 348 - 363
  • [46] Construction site layout planning using GIS overlay analysis—A case study
    Atmaca M.
    Akcay C.
    Arabian Journal of Geosciences, 2021, 14 (7)
  • [47] Multi-objective construction site layout planning using genetic algorithms
    Papadaki, Joanna N.
    Chassiakos, Athanasios P.
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 20 - 27
  • [48] A generative design method of building layout generated by path
    Liu Yong
    Hao Chibiao
    APPLIED MATHEMATICS AND NONLINEAR SCIENCES, 2022, 7 (02) : 825 - 848
  • [49] Using 4D BIM to assess construction risks during the design phase
    Jin, Ziyu
    Gambatese, John
    Liu, Ding
    Dharmapalan, Vineeth
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (11) : 2637 - 2654
  • [50] Reconciling strategy towards construction site selection-layout for coal-fired power plants
    Song, Xiaoling
    Xu, Jiuping
    Zhang, Zhe
    Shen, Charles
    Xie, Heping
    Pena-Mora, Feniosky
    Wu, Yimin
    APPLIED ENERGY, 2017, 204 : 846 - 865