Implementing lean construction to improve quality and megaproject construction: a case study

被引:8
作者
Idrissi Gartoumi, Khalil [1 ]
Aboussaleh, Mohamed [1 ]
Zaki, Smail [1 ]
机构
[1] Moulay Ismail Univ, Natl Higher Sch Arts & Crafts, Dept Civil Engn, Meknes, Morocco
关键词
Megaproject; Tower; Quality; DMAIC; Lean construction (LC); Construction management; INDUSTRY; 4.0; MANAGEMENT; PROJECTS; REDUCE; SAFETY; MODEL; COST;
D O I
10.1108/JFMPC-12-2022-0063
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
PurposeThis paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects. Design/methodology/approachThis paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define-Measure-Analysis-Improve-Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process. FindingsFirstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators. Research limitations/implicationsThis document focuses on one part of the tower's construction and is limited to a project case in a country where LC is rarely used. Originality/valueThis study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.
引用
收藏
页码:1 / 22
页数:22
相关论文
共 75 条
[1]  
Abbasian-Hosseini SA, 2014, KSCE J CIV ENG, V18, P1248
[3]   Barriers to adopting lean construction in the construction industry: a literature review [J].
Albalkhy, Wassim ;
Sweis, Rateb .
INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2021, 12 (02) :210-236
[4]   Improving construction management practice with the Last Planner System: a case study [J].
AlSehaimi, Abdullah ;
Fazenda, Patricia ;
Koskela, Lauri .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (01) :51-+
[5]  
Andersen B., 2012, Lean Construction Journal, P122
[6]  
[Anonymous], 2016, INT J HOUSING SCI
[7]  
[Anonymous], 2016, ARPN J. Eng. Appl. Sci.
[8]  
Araque Gonzalez G. A., 2019, INT J RECENT TECHNOL, V8, P173
[9]   Exploring factors for implementing lean construction for rapid initial successes in construction [J].
Aslam, Mughees ;
Gao, Zhili ;
Smith, Gary .
JOURNAL OF CLEANER PRODUCTION, 2020, 277
[10]   Applying lean thinking in construction and performance improvement [J].
Aziz, Remon Fayek ;
Hafez, Sherif Mohamed .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (04) :679-695