An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints

被引:10
作者
Rohaninejad, Mohammad [1 ]
Vahedi-Nouri, Behdin [1 ,2 ]
Hanzalek, Zdenek [1 ]
Tavakkoli-Moghaddam, Reza [2 ]
机构
[1] Czech Tech Univ, Czech Inst Informat Robot & Cybernet, Prague, Czech Republic
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
Reconfigurable manufacturing system; reconfigurable machine tool; schedulin; lot-sizing; decomposition heuristic; GENETIC ALGORITHM; OPTIMIZATION; DESIGN;
D O I
10.1080/00207543.2023.2253311
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, achieving higher levels of flexibility in manufacturing systems is necessary to maintain and enhance competitiveness. Accordingly, a new generation of production machine, namely Reconfigurable Machine Tool (RMT), has recently been introduced that can be effectively adapted to changes. Nevertheless, such systems are more worker-reliant, and neglecting workforce aspects results in suboptimal or even infeasible production schedules. In this regard, this study investigates an integrated lot-sizing and scheduling problem benefiting from RMTs under workforce constraints. First, a novel Mixed-Integer Linear Programming (MILP) model is provided to formulate the problem. Afterward, to confront the high complexity of the problem, an efficient Decomposition Heuristic (DH) empowered by a tailored feasibility cut is devised. A combination of MILP and Constraint Programming (CP) is employed in the DH to model the relevant master and sub-problems, respectively. Finally, the performance of the DH compared to the MILP model and an extended lower bound is evaluated. Moreover, the advantages of utilizing RMTs in the system are explored based on four defined key performance indicators.
引用
收藏
页码:3994 / 4013
页数:20
相关论文
共 64 条
[51]   Simultaneous lot-sizing and scheduling in flexible job shop problems [J].
Rohaninejad, Mohammad ;
Kheirkhah, Amirsaman ;
Fattahi, Parviz .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 78 (1-4) :1-18
[52]   The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network [J].
Roshani, Abdolreza ;
Paolucci, Massimo ;
Giglio, Davide ;
Demartini, Melissa ;
Tonelli, Flavio ;
Dulebenets, Maxim A. .
ANNALS OF OPERATIONS RESEARCH, 2023, 321 (1-2) :469-505
[53]   Solving a flexible job shop lot sizing problem with shared operations using a self-adaptive COA [J].
Sangroudi, Hadi Abdollahzadeh ;
Ranjbar-Bourani, Mehdi .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (02) :483-515
[54]   MIP approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products [J].
Soler, Willy A. O. ;
Santos, Maristela O. ;
Akartunali, Kerem .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2021, 72 (08) :1691-1706
[55]   Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource [J].
Tempelmeier, Horst ;
Buschkuehl, Lisbeth .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (01) :401-412
[56]   Solving the integrated lot-sizing and job-shop scheduling problem [J].
Urrutia, Edwin David Gomez ;
Aggoune, Riad ;
Dauzere-Peres, Stephane .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (17) :5236-5254
[57]   Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration [J].
Vahedi-Nouri, Behdin ;
Tavakkoli-Moghaddam, Reza ;
Hanzalek, Zdenek ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (03) :767-783
[58]   Workforce planning and production scheduling in a reconfigurable manufacturing system facing the COVID-19 pandemic [J].
Vahedi-Nouri, Behdin ;
Tavakkoli-Moghaddam, Reza ;
Hanzalek, Zdenek ;
Dolgui, Alexandre .
JOURNAL OF MANUFACTURING SYSTEMS, 2022, 63 :563-574
[59]   Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods [J].
Vahedi-Nouri, Behdin ;
Tavakkoli-Moghaddam, Reza ;
Hanzalek, Zdenek ;
Arbabi, Hamidreza ;
Rohaninejad, Mohammad .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (07) :2009-2027
[60]   A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times [J].
Xiao, Jing ;
Yang, Huasheng ;
Zhang, Canrong ;
Zheng, Li ;
Gupta, Jatinder N. D. .
COMPUTERS & OPERATIONS RESEARCH, 2015, 63 :72-82