An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints

被引:7
作者
Rohaninejad, Mohammad [1 ]
Vahedi-Nouri, Behdin [1 ,2 ]
Hanzalek, Zdenek [1 ]
Tavakkoli-Moghaddam, Reza [2 ]
机构
[1] Czech Tech Univ, Czech Inst Informat Robot & Cybernet, Prague, Czech Republic
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
Reconfigurable manufacturing system; reconfigurable machine tool; schedulin; lot-sizing; decomposition heuristic; GENETIC ALGORITHM; OPTIMIZATION; DESIGN;
D O I
10.1080/00207543.2023.2253311
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, achieving higher levels of flexibility in manufacturing systems is necessary to maintain and enhance competitiveness. Accordingly, a new generation of production machine, namely Reconfigurable Machine Tool (RMT), has recently been introduced that can be effectively adapted to changes. Nevertheless, such systems are more worker-reliant, and neglecting workforce aspects results in suboptimal or even infeasible production schedules. In this regard, this study investigates an integrated lot-sizing and scheduling problem benefiting from RMTs under workforce constraints. First, a novel Mixed-Integer Linear Programming (MILP) model is provided to formulate the problem. Afterward, to confront the high complexity of the problem, an efficient Decomposition Heuristic (DH) empowered by a tailored feasibility cut is devised. A combination of MILP and Constraint Programming (CP) is employed in the DH to model the relevant master and sub-problems, respectively. Finally, the performance of the DH compared to the MILP model and an extended lower bound is evaluated. Moreover, the advantages of utilizing RMTs in the system are explored based on four defined key performance indicators.
引用
收藏
页码:3994 / 4013
页数:20
相关论文
共 64 条
  • [1] Design, refinement, implementation and prototype testing of a reconfigurable lathe-mill
    Aguilar, Alejandro
    Roman-Flores, Armando
    Huegel, Joel C.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (02) : 364 - 371
  • [2] Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method
    Alimian, Mahyar
    Ghezavati, Vahidreza
    Tavakkoli-Moghaddam, Reza
    Ramezanian, Reza
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168
  • [3] New integration of preventive maintenance and production planning with cell formation and group scheduling for dynamic cellular manufacturing systems
    Alimian, Mahyar
    Ghezavati, Vahidreza
    Tavakkoli-Moghaddam, Reza
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2020, 56 : 341 - 358
  • [4] Synchronisation of scarce resources for a parallel machine lotsizing problem
    Almeder, Christian
    Almada-Lobo, Bernardo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (24) : 7315 - 7335
  • [5] Approaches for the joint resolution of lot-sizing and scheduling with infeasibilities occurrences
    Alves, Fernanda F.
    Nogueira, Thiago H.
    de Souza, Mauricio C.
    Ravetti, Martin G.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 155
  • [6] Reconfigurability improvement in Industry 4.0: a hybrid genetic algorithm-based heuristic approach for a co-generation of setup and process plans in a reconfigurable environment
    Ameer, Muhammad
    Dahane, Mohammed
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2023, 34 (03) : 1445 - 1467
  • [7] Flow shop scheduling with heterogeneous workers
    Benavides, Alexander J.
    Ritt, Marcus
    Miralles, Cristobal
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (02) : 713 - 720
  • [8] A polynomial-time scheduling approach to minimise idle energy consumption: An application to an industrial furnace
    Benedikt, Ondrej
    Alikoc, Baran
    Sucha, Premysl
    Celikovsky, Sergej
    Hanzalek, Zdenek
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2021, 128
  • [9] A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems
    Bensmaine, A.
    Dahane, M.
    Benyoucef, L.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (12) : 3583 - 3594
  • [10] Ageing workforce effects in Dual-Resource Constrained job-shop scheduling
    Berti, Nicola
    Finco, Serena
    Battaia, Olga
    Delorme, Xavier
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 237