Resource-constrained multi-project scheduling problem: A survey

被引:51
作者
Gomez Sanchez, Mariam [1 ]
Lalla-Ruiz, Eduardo [2 ]
Gil, Alejandro Fernandez [1 ]
Castro, Carlos [1 ]
Voss, Stefan [3 ]
机构
[1] Univ Tecn Federico Santa Maria, Dept Informat, Ave Espana 1680, Valparaiso 2390123, Chile
[2] Univ Twente, Dept Business Informat Syst & Ind Engn, Hallenweg 17, NL-7522 NH Enschede, Netherlands
[3] Univ Hamburg, Inst Informat Syst, Von Melle Pk 5, D-20146 Hamburg, Germany
关键词
Project scheduling; Resource constrained; Multi project; Project management; PRIORITY RULES; LIMITED RESOURCES; SELECTION; ALGORITHM; PORTFOLIO; SEARCH; SYSTEM; MODEL; IMPLEMENTATION; OPTIMIZATION;
D O I
10.1016/j.ejor.2022.09.033
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Project Management is becoming increasingly crucial in competitive environments such as manufacturing and the service industries. The Resource-Constrained Multi-Project Scheduling Problem (RCMPSP) consists of assigning start times to jobs corresponding to two or more projects that must be executed simulta-neously while respecting the precedence between jobs and limited resources. The existing rise in the study of the RCMPSP resulted in numerous works on the topic while proposing different problem fea-tures. This research analyzes different variants of the problem based on aspects related to jobs, projects, relationships, resources, and time management. Moreover, based on the problem variants considered in the collected works, a taxonomy allowing (i) the identification and positioning of each RCMPSP variant and (ii) the analysis of the current state-of-the-art of the problem is proposed. In addition, the solution methods proposed to solve RCMPSPs are classified and analyzed, together with the benchmarks used to validate such approaches. Finally, this review paper discusses the RCMPSP connection to practice and provides future research opportunities in light of recent advances.(c) 2022 Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
引用
收藏
页码:958 / 976
页数:19
相关论文
共 135 条
[1]   A multi-agent system for decentralized multi-project scheduling with resource transfers [J].
Adhau, Sunil ;
Mittal, M. L. ;
Mittal, Abhinav .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) :646-661
[2]   A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach [J].
Adhau, Sunil ;
Mittal, M. L. ;
Mittal, Abhinav .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (08) :1738-1751
[3]  
Ahmeti A., 2021, P 13 INT C PRACT THE, V1, P188
[4]   Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm [J].
Amirian, Homa ;
Sahraeian, Rashed .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 :141-149
[5]   Strong bounds for resource constrained project scheduling: Preprocessing and cutting planes [J].
Araujo, Janniele A. S. ;
Santos, Haroldo G. ;
Gendron, Bernard ;
Jena, Sanjay Dominik ;
Brito, Samuel S. ;
Souza, Danilo S. .
COMPUTERS & OPERATIONS RESEARCH, 2020, 113
[6]   Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem [J].
Asta, Shahriar ;
Karapetyan, Daniel ;
Kheiri, Ahmed ;
Ozcan, Ender ;
Parkes, Andrew J. .
INFORMATION SCIENCES, 2016, 373 :476-498
[7]  
BCA, 2017, CONQUAS BCA CONSTR Q
[8]   Solving resource-constrained multi-project environment under different activity assumptions [J].
Ben Issa S. ;
Patterson R.A. ;
Tu Y. .
International Journal of Production Economics, 2021, 232
[9]   A survey in the resource-constrained project and multi-project scheduling problems [J].
Ben Issa, Samer ;
Tu, Yiliu .
JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) :117-138
[10]   Multi-mode resource constrained multi-project scheduling and resource portfolio problem [J].
Besikci, Umut ;
Bilge, Umit ;
Ulusoy, Gunduz .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) :22-31