BIM-based solution to enhance the performance of public-private partnership construction projects using copula bayesian network

被引:22
作者
Ghorbany, Siavash [1 ]
Noorzai, Esmatullah [1 ]
Yousefi, Saied [1 ]
机构
[1] Univ Tehran, Sch Architecture, Dept Project & Construct Management, Tehran, Iran
关键词
Building information modeling (BIM); Copula bayesian network (CBN); Key performance indicators (KPIs); Public -private partnerships (PPPs); XGBoost machine learning; SHAP analysis; PPP; INDICATORS; RISK; QUESTIONNAIRE; MANAGEMENT; KNOWLEDGE; SELECTION; INDUSTRY; RANKING; MODEL;
D O I
10.1016/j.eswa.2023.119501
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Public-private partnerships (PPPs) are efficient methods for constructing infrastructures that create many opportunities, specifically in financial crises. However, the cost/time overruns have raised many problems in these projects that show their feeble performance. That said, optimizing the key performance indicators (KPIs) have been neglected as a crucial part of performance enhancement. Therefore, analyzing and proposing a Building Information Modeling (BIM) based model to improve KPIs condition have been chosen as the main objective of this research. In this research, the Copula Bayesian Network (CBN) has been selected as a robust statistical technique to determine causal structure ability and estimate the variables' impact on each other. Unlike similar research, this study has used Python programming, Shapley Additive exPlanations (SHAP), and Extreme Gradient Boosting (XGBoost) to comprehensively analyze CBN and provide quantitative analysis to assess the BIM impact on PPPs. This research has estimated the influence of BIM on PPPs' performance and extracted the most prominent KPIs in BIM enabling conditions, including the feasibility study, finance/cost performance, appropriate financing option, risk identification, allocation, sharing, and transfer, finance infrastructure, and compliance to the legal and regulatory framework. This study proved that BIM could improve PPPs performance by 28.9% on average. The outcome of this research helps the private sector to gain a comprehensive perspective on implementing BIM and its effects on PPP projects and gives an insight into BIM's importance and efficiency in solving critical PPP issues for future researchers.
引用
收藏
页数:18
相关论文
共 43 条
[31]   Decision making behaviours and management mechanisms for construction and demolition waste recycling based on public-private partnership [J].
Lu, Wei ;
Du, Lei ;
Feng, Yingbin .
ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (54) :82078-82097
[32]   Risk management of public-private partnership charging infrastructure projects in China based on a three-dimension framework [J].
Wu, Yunna ;
Song, Zixin ;
Li, Lingwenying ;
Xu, Ruhang .
ENERGY, 2018, 165 :1089-1101
[33]   A Study on the Impact of Team Interdependence on Cooperative Performance in Public-Private Partnership Projects: The Moderating Effect of Government Equity Participation [J].
Zhang, Han ;
Shi, Shiying ;
Zhao, Fangfang ;
Ye, Xiaosu ;
Qi, Hanyue .
SUSTAINABILITY, 2023, 15 (17)
[34]   How Can Construction and Demolition Waste Recycling Public-Private Partnership Projects Performance Compensate during the Operation Period? A Two-Stage Perspective of Recycling and Remanufacturing [J].
Liu, Yuxin ;
Hao, Jiekuo ;
Li, Chunhui ;
Li, Yuejia ;
Zhou, Chuyue ;
Zheng, Haoxuan ;
Xu, Shiqi ;
Chen, Weihong ;
Li, Xingwei .
SYSTEMS, 2023, 11 (04)
[35]   USING FUZZY ANALYTIC NETWORK PROCESS AND ISM METHODS FOR RISK ASSESSMENT OF PUBLIC-PRIVATE PARTNERSHIP: A CHINA PERSPECTIVE [J].
Li, Yan ;
Wang, Xinyu .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (02) :168-183
[36]   PROBABILISTIC RISK IDENTIFICATION AND ASSESSMENT MODEL FOR CONSTRUCTION PROJECTS USING ELICITATION BASED BAYESIAN NETWORK [J].
Khodabakhshian, Ania ;
Cecconi, Fulvio Re ;
Droguett, Enrique Lopez .
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2025, 30 :185-212
[37]   Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach [J].
Ameyaw, Effah Ernest ;
Chan, Albert P. C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) :5102-5116
[38]   Modelling critical success factors (CSFs) for Ghanaian public-private partnership (PPP) power projects using fuzzy synthetic evaluation (FSE) [J].
Kukah, Augustine Senanu Komla ;
Owusu-Manu, De-Graft ;
Badu, Edward ;
Edwards, David John ;
Asamoah, Eric .
JOURNAL OF FACILITIES MANAGEMENT, 2025, 23 (01) :71-97
[39]   Prioritising sustainability factors for public-private partnership (PPP)-based mature telecentres using the ?Akshaya? project as a case [J].
Mishra, Gaurav ;
Shah, Reena .
AUSTRALASIAN JOURNAL OF INFORMATION SYSTEMS, 2023, 27
[40]   Assessing and Prioritizing Risks in Public-Private Partnership (PPP) Projects Using the Integration of Fuzzy Multi-Criteria Decision-Making Methods [J].
Jokar, Ebrahim ;
Aminnejad, Babak ;
Lork, Alireza .
OPERATIONS RESEARCH PERSPECTIVES, 2021, 8