BIM-based solution to enhance the performance of public-private partnership construction projects using copula bayesian network

被引:22
|
作者
Ghorbany, Siavash [1 ]
Noorzai, Esmatullah [1 ]
Yousefi, Saied [1 ]
机构
[1] Univ Tehran, Sch Architecture, Dept Project & Construct Management, Tehran, Iran
关键词
Building information modeling (BIM); Copula bayesian network (CBN); Key performance indicators (KPIs); Public -private partnerships (PPPs); XGBoost machine learning; SHAP analysis; PPP; INDICATORS; RISK; QUESTIONNAIRE; MANAGEMENT; KNOWLEDGE; SELECTION; INDUSTRY; RANKING; MODEL;
D O I
10.1016/j.eswa.2023.119501
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Public-private partnerships (PPPs) are efficient methods for constructing infrastructures that create many opportunities, specifically in financial crises. However, the cost/time overruns have raised many problems in these projects that show their feeble performance. That said, optimizing the key performance indicators (KPIs) have been neglected as a crucial part of performance enhancement. Therefore, analyzing and proposing a Building Information Modeling (BIM) based model to improve KPIs condition have been chosen as the main objective of this research. In this research, the Copula Bayesian Network (CBN) has been selected as a robust statistical technique to determine causal structure ability and estimate the variables' impact on each other. Unlike similar research, this study has used Python programming, Shapley Additive exPlanations (SHAP), and Extreme Gradient Boosting (XGBoost) to comprehensively analyze CBN and provide quantitative analysis to assess the BIM impact on PPPs. This research has estimated the influence of BIM on PPPs' performance and extracted the most prominent KPIs in BIM enabling conditions, including the feasibility study, finance/cost performance, appropriate financing option, risk identification, allocation, sharing, and transfer, finance infrastructure, and compliance to the legal and regulatory framework. This study proved that BIM could improve PPPs performance by 28.9% on average. The outcome of this research helps the private sector to gain a comprehensive perspective on implementing BIM and its effects on PPP projects and gives an insight into BIM's importance and efficiency in solving critical PPP issues for future researchers.
引用
收藏
页数:18
相关论文
共 43 条
  • [1] Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network
    Ghorbany, Siavash
    Yousefi, Saied
    Noorzai, Esmatullah
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (01) : 290 - 323
  • [2] A review of studies on Public-Private Partnership projects in the construction industry
    Tang, LiYaning
    Shen, Qiping
    Cheng, Eddie W. L.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (07) : 683 - 694
  • [3] Sustainable performance assessment of public-private partnership infrastructure projects in Ghana
    Akomea-Frimpong, Isaac
    Jin, Xiaohua
    Osei-Kyei, Robert
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [4] Sustainable Performance Measurements for Public-Private Partnership Projects: Empirical Evidence from China
    Liang, Yanhong
    Wang, Hongdi
    SUSTAINABILITY, 2019, 11 (13)
  • [5] Community and public-private partnership projects in Uganda: community engagement, trust and performance
    Magoola, Isaac Wanzige
    Mwesigwa, Rogers
    Nabwami, Ruth
    JOURNAL OF ENTERPRISING COMMUNITIES-PEOPLE AND PLACES IN THE GLOBAL ECONOMY, 2023, 17 (02) : 221 - 241
  • [6] Risk-based integrated performance assessment framework for public-private partnership infrastructure projects
    Fatima, Anam
    Mubin, Sajjad
    Masood, Rehan
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 251 - 274
  • [7] BIM Based Value for Money Assessment in Public-Private Partnership
    Ren, Guoqian
    Li, Haijiang
    COLLABORATION IN A DATA-RICH WORLD, 2017, 506 : 51 - 62
  • [8] Risk evaluation of electric vehicle charging infrastructure public-private partnership projects in China using fuzzy TOPSIS
    Liu, Jicheng
    Wei, Qiushuang
    JOURNAL OF CLEANER PRODUCTION, 2018, 189 : 211 - 222
  • [9] Performance Objectives Selection Model in Public-Private Partnership Projects Based on the Perspective of Stakeholders
    Yuan, Jingfeng
    Skibniewski, Miroslaw J.
    Li, Qiming
    Zheng, Lei
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (02) : 89 - 104
  • [10] Life Cycle Performance Measurement in Public-Private Partnership Infrastructure Projects
    Kim, Soo Yong
    Le Dinh Thuc
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (04)