Adaptive production control of two-product closed-loop supply chain dynamics under disruptions

被引:11
作者
Corsini, Roberto Rosario [1 ]
机构
[1] Univ Catania, DICAR Dept, Catania, Italy
关键词
supply chain dynamics; disruption; changeover; production control; bullwhip; DDMRP; MANUFACTURING SYSTEM; INVENTORY VARIANCE; JOINT PRODUCTION; SETUP CONTROL; BULLWHIP; CAPACITY; POLICIES; IMPACT; PERFORMANCE; ISSUES;
D O I
10.1080/21681015.2023.2256962
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the dynamics of a two-product closed-loop supply chain with realistic assumptions on production capacity constraints. The closed-loop supply chain is also subject to unpredictable disruptions, which lead to the non-stationarity of customer demand. The factory employs a production control policy to decide the product type to be processed. We propose a novel production control policy, named the Adaptive Hedging Corridor Policy, which makes decisions on production capacity based on the demand evolution. The proposed strategy is compared with well-known production control policies widely used in literature, such as DDMRP. Simulation results demonstrate the benefits of implementing an adaptive production control as it enables the closed-loop supply chain to enhance customer service level and bullwhip effect. Additionally, a sensitivity analysis is provided to assess the influence of experimental factors on the performance. The analysis highlights the significance of return flows and manufacturing operations for the closed-loop supply chain.
引用
收藏
页码:638 / 660
页数:23
相关论文
共 59 条
[1]  
Abbey JamesD., 2017, SUSTAINABLE SUPPLY C, P375, DOI [DOI 10.1007/978-3-319-29791-0_17, 10.1007/978-3-319-29791-0_17]
[2]   OPTIMAL-CONTROL OF PRODUCTION-RATE IN A FAILURE PRONE MANUFACTURING SYSTEM [J].
AKELLA, R ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1986, 31 (02) :116-126
[3]   Production Planning and Opportunistic Preventive Maintenance for Unreliable One-Machine Two-Products Manufacturing Systems [J].
Assid, M. ;
Gharbi, A. ;
Hajji, A. .
IFAC PAPERSONLINE, 2015, 48 (03) :484-489
[4]   Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems [J].
Assid, M. ;
Gharbi, A. ;
Hajji, A. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (15) :4668-4683
[5]   Joint production and setup control policies: an extensive study addressing implementation issues via quantitative and qualitative criteria [J].
Assid, M. ;
Gharbi, A. ;
Hajji, A. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (5-8) :809-826
[6]   Forecasting and inventory performance in a two-stage supply chain with ARIMA(0,1,1) demand: Theory and empirical analysis [J].
Babai, M. Z. ;
Ali, M. M. ;
Boylan, J. E. ;
Syntetos, A. A. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (02) :463-471
[7]   Scheduling of an unreliable manufacturing system with nonresumable setups [J].
Bai, SX ;
Elhafsi, M .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (04) :909-925
[8]   Risk Propagation Decision-Making for Product and Supply Chain Change Systems Under COVID-19: An Assessment-to-Control Support Scheme [J].
Cao, En-Zhi ;
Peng, Chen ;
Cao, Zhiru .
IEEE TRANSACTIONS ON COMPUTATIONAL SOCIAL SYSTEMS, 2024, 11 (01) :465-477
[9]   Returns and the bullwhip effect [J].
Chatfield, Dean C. ;
Pritchard, Alan M. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2013, 49 (01) :159-175
[10]   Comparing production control policies in two-product supply chain dynamics [J].
Corsini, R. R. ;
Costa, A. ;
Fichera, S. .
2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, :1002-1007