Applying the new multi-objective algorithms for the operation of a multi-reservoir system in hydropower plants

被引:6
|
作者
Hashemi, Syed Mohsen Samare [1 ]
Robati, Amir [1 ]
Kazerooni, Mohammad Ali [1 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Kerman Branch, Kerman, Iran
关键词
Multi-objective evolutionary algorithm; Multi-reservoir systems; Karun basin; WATER-RESOURCE SYSTEM; EVOLUTIONARY ALGORITHMS; GENETIC ALGORITHM; OPTIMIZATION;
D O I
10.1038/s41598-024-54326-z
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The optimal operation of the multi-purpose reservoir system is a difficult, and, sometimes, non-linear problem in multi-objective optimization. By simulating biological behavior, meta-heuristic algorithms scan the decision space and can offer a set of points as a group of solutions to a problem. Because it is essential to simultaneously optimize several competing objectives and consider relevant constraints as the main problem in many optimization problems, researchers have improved their ability to solve multi-objective problems by developing complementary multi-objective algorithms. Because the AHA algorithm is new, its multi-objective version, MOAHA (multi-objective artificial hummingbird algorithm), was used in this study and compared with two novel multi-objective algorithms, MOMSA and MOMGA. Schaffer and MMF1 were used as two standard multi-objective benchmark functions to gauge the effectiveness of the proposed method. Then, for 180 months, the best way to operate the reservoir system of the Karun River basin, which includes Karun 4, Karun 3, Karun 1, Masjed-e-Soleyman, and Gotvand Olia dams to generate hydropower energy, supply downstream demands (drinking, agriculture, industry, environmental), and control flooding was examined from September 2000 to August 2015. Four performance appraisal criteria (GD, S, Delta, and MS) and four evaluation indices (reliability, resiliency, vulnerability, and sustainability) were used in Karun's multi-objective multi-reservoir problem to evaluate the performance of the multi-objective algorithm. All three algorithms demonstrated strong capability in criterion problems by using multi-objective algorithms' criteria and performance indicators. The large-scale (1800 dimensions) of the multi-objective operation of the Karun Basin reservoir system was another problem. With a minimum of 1441.71 objectives and an average annual hydropower energy manufacturing of 17,166.47 GW, the MOAHA algorithm demonstrated considerable ability compared to the other two. The final results demonstrated the MOAHA algorithm's excellent performance, particularly in difficult and significant problems such as multi-reservoir systems' optimal operation under various objectives.
引用
收藏
页数:27
相关论文
共 50 条
  • [1] Applying the new multi-objective algorithms for the operation of a multi-reservoir system in hydropower plants
    Syed Mohsen Samare Hashemi
    Amir Robati
    Mohammad Ali Kazerooni
    Scientific Reports, 14
  • [2] Multi-Objective Model Predictive Control for Real-Time Operation of a Multi-Reservoir System
    Lin, Nay Myo
    Tian, Xin
    Rutten, Martine
    Abraham, Edo
    Maestre, Jose M.
    van de Giesen, Nick
    WATER, 2020, 12 (07)
  • [3] Genetic Algorithms for Multi-objective Optimization: Application to a Multi-reservoir System in the Chi River Basin, Thailand
    Kumphon, Bungon
    WATER RESOURCES MANAGEMENT, 2013, 27 (12) : 4369 - 4378
  • [4] An efficient multi-objective evolutionary approach for solving the operation of multi-reservoir system scheduling in hydro-power plants
    Marcelino, C. G.
    Leite, G. M. C.
    Delgado, C. A. D. M.
    de Oliveira, L. B.
    Wanner, E. F.
    Jimenez-Fernandez, S.
    Salcedo-Sanz, S.
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 185
  • [5] Genetic Algorithms for Multi-objective Optimization: Application to a Multi-reservoir System in the Chi River Basin, Thailand
    Bungon Kumphon
    Water Resources Management, 2013, 27 : 4369 - 4378
  • [6] Multi-objective Optimal Reservoir Operation
    Scola, Luis A.
    Neto, Oriane M.
    Takahashi, Ricardo H. C.
    Cerqueira, Sergio A. A. G.
    2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2010,
  • [7] A hybrid method for multi-objective hydropower system operation
    Shen, Jianjian
    Cheng, Chuntian
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT, 2016, 169 (03) : 115 - 127
  • [8] Reservoir Operation Management with New Multi-Objective (MOEPO) and Metaheuristic (EPO) Algorithms
    Yoosefdoost, Icen
    Basirifard, Milad
    Alvarez-Garcia, Jose
    WATER, 2022, 14 (15)
  • [9] Cascade Hydropower System Operation Considering Ecological Flow Based on Different Multi-Objective Genetic Algorithms
    Chen, Yubin
    Wang, Manlin
    Zhang, Yu
    Lu, Yan
    Xu, Bin
    Yu, Lei
    WATER RESOURCES MANAGEMENT, 2023, 37 (08) : 3093 - 3110
  • [10] Multi-objective Optimal Multiple Reservoir Operation
    Scola, Luis A.
    Neto, Oriane Magela
    Takahashi, Ricardo H. C.
    Cerqueira, Sergio A. A. G.
    2011 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2011, : 1927 - 1933