A two-stage stochastic supply chain scheduling problem with production in cellular manufacturing environment: A case study

被引:3
|
作者
Esmailnezhad, B. [1 ]
Saidi-Mehrabad, M. [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Univ Ave Narmak,POB 1684613114, Tehran, Iran
关键词
Mathematical optimization; Supply chain scheduling; Cellular manufacturing; Queuing theory; Meta-heuristic; MULTIOBJECTIVE GENETIC ALGORITHM; GROUP TECHNOLOGY; MODEL; TRANSPORTATION; TARDINESS; SELECTION; DELIVERY; INVENTORY; RESOURCE; DESIGN;
D O I
10.24200/sci.2021.53506.3277
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An integrated decision in supply chain is a significant principle for proper competition in today's market. This paper proposes a novel mathematical model in a two-stage supply chain scheduling to make a coordination between procurement and manufacturing activities. The supply chain scheduling along with the production approach of cellular manufacturing under demand, processing time, and transportation time uncertainties makes business environment sustainably responsive to the changing needs of customers. Uncertainties are formulated by queuing theory. In this paper, a new mixed-integer nonlinear programming formulation is used to determine types of vehicles to carry raw materials, suppliers to procure, priority of each part in order to process, and cell formation to configure work centers. The goal is to minimize total tardiness. A linearization method is used to ease tractability of the model. A genetic algorithm is developed due to the NP-hard nature of the problem. The parameters of the genetic algorithm are set and estimated by Taguchi's experimental design. Numerous test problems are employed to validate the effectiveness of the modeling and the efficiency of solution approaches. Finally, a real case study and a sensitivity analysis are discussed to provide significant managerial insights and assess the applicability of the proposed model.
引用
收藏
页码:1399 / 1422
页数:24
相关论文
共 50 条
  • [1] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343
  • [2] Joint cyclic production and delivery scheduling in a two-stage supply chain
    Pundoor, Guruprasad
    Chen, Zhi-Long
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 119 (01) : 55 - 74
  • [3] A two-stage multi-echelon stochastic blood supply chain problem
    Hamdan, Bayan
    Diabat, Ali
    COMPUTERS & OPERATIONS RESEARCH, 2019, 101 : 130 - 143
  • [4] Two-Stage Production Planning Under Stochastic Demand: Case Study of Fertilizer Manufacturing
    Wang, Chia-Nan
    Syu, Shao-Dong
    Chou, Chien-Chang
    Viet Tinh Nguyen
    Dang Van Thuy Cuc
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 70 (01): : 1195 - 1207
  • [5] Scheduling in a two-stage supply chain with uncertain parameters
    Shen, Jiayu
    Zhu, Yuanguo
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2016, 30 (06) : 3439 - 3449
  • [6] Two-Stage Supply Chain Scheduling with an Option of Outsourcing in Stage One
    Qi, Xiangtong
    2008 5TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2008, : 248 - 253
  • [7] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Zegordi, Seyed Hessameddin
    Nia, Mohammad Ali Beheshti
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10): : 928 - 939
  • [8] A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
    Zegordi, S. H.
    Abadi, I. N. Kamal
    Nia, M. A. Beheshti
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (03) : 373 - 381
  • [9] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Seyed Hessameddin Zegordi
    Mohammad Ali Beheshti Nia
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 928 - 939
  • [10] Production and distribution policy in a two-stage stochastic push-pull supply chain
    Ahn, HS
    Kaminsky, P
    IIE TRANSACTIONS, 2005, 37 (07) : 609 - 621