Heterogeneous embankment dam under rapid drawdown

被引:1
作者
Aldungarova, A. K. [1 ]
Mkilima, T. M. [2 ]
Utepov, Ye. B. [2 ,3 ]
Tulebekova, A. S. [2 ,3 ]
Zharassov, Sh. Zh. [2 ,3 ]
机构
[1] D Serikbayev East Kazakhstan Tech Univ, Ust Kamenogorsk, Kazakhstan
[2] LN Gumilyov Eurasian Natl Univ, Astana, Kazakhstan
[3] CSI Res & Lab LLP, Astana, Kazakhstan
来源
MAGAZINE OF CIVIL ENGINEERING | 2023年 / 117卷 / 01期
关键词
slope stability; safety factor; embankment dam; numerical analysis; finite element; SLOPE STABILITY; FAILURE; SAFETY;
D O I
10.34910/MCE.117.8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Loading conditions are among the significant determinants of the stability of embankment dams: they need to be carefully investigated during the design phase of the dam construction. Unfortunately, it is almost impossible to investigate the combination of these parameters in-situ. In the current work, the influence of rapid drawdown loading conditions on the stability of the embankment dam was investigated with the help of numerical modeling for a case of the Aktobe dam in Kazakhstan. The seepage analyses were carried out concurrently with slope stability analyses. Mainly, five different drawdown cases were investigated, which are: steady-state, instantaneous drawdown, 5-days drawdown, 10-days drawdown, and 1m per day drawdown rate. In terms of flow type, both steady-state and transient flow conditions were investigated. In general, when the embankment was subjected to the 1 m per day drawdown rate a minimum factor of safety value of 1.486 was retrieved from computations. The factor of safety value is equivalent to a 3.7 % increase from the 10 days drawdown rate, 8.3 % from the 5 days drawdown rate and 48.6 % from the instantaneous drawdown.
引用
收藏
页数:13
相关论文
共 41 条
[1]   Description of the Tous Dam break case study (Spain) [J].
Alcrudo, F. ;
Mulet, J. .
JOURNAL OF HYDRAULIC RESEARCH, 2007, 45 :45-57
[2]   Numerical analysis of rapid drawdown: Applications in real cases [J].
Alonso, Eduardo E. ;
Pinyol, Nuria M. .
WATER SCIENCE AND ENGINEERING, 2016, 9 (03) :175-182
[3]  
Atashband S., 2015, Numerical Methods for Reliability and Safety Assessment
[4]  
Cherubini C, 2001, J GEOTECH GEOENVIRON, V127, P700, DOI 10.1061/(ASCE)1090-0241(2001)127:8(700)
[5]  
de Rubertis K., 2018, EMBANKMENT DAMS MONI, P295
[6]  
Diacon A., 1992, ANAL BELCI DAM FAIL
[7]  
Eikenberry Wi.F., 1977, FAILURE TETON DAM RE
[8]  
Fang H.-Y., 2017, INTRO GEOTECHNICAL E, P1
[9]  
Fell R., 2005, GEOTECHNICAL ENG DAM
[10]  
GEO-SLOPE International Ltd, 2003, RAP DRAWD MULT