共 34 条
- [1] Cao X., 2010, STUDY SAFE THICKNESS
- [2] Cheng LC, 2011, DISASTER ADV, V4, P21
- [5] Guo JQ., 2011, Study on against-inrush thickness and water burst mechanism of karst tunnel
- [9] Jiao SX., 2018, SHANDONG COAL SCI TE, V12, P2
- [10] Range Analysis of Matrix Factorization Algorithms for an Overflow Free Fixed-point Design [J]. JOURNAL OF SIGNAL PROCESSING SYSTEMS FOR SIGNAL IMAGE AND VIDEO TECHNOLOGY, 2019, 91 (07): : 787 - 804