Establishment of urban road maintenance model based on performance-based contracts

被引:4
作者
Yang, Jyh-Bin [1 ]
Tseng, Chun-Chieh [1 ]
Chang, Jia-Ruey [2 ]
Liu, Chia-Ming [3 ]
机构
[1] Natl Cent Univ, Dept Civil Engn, Taoyuan, Taiwan
[2] Natl Ilan Univ, Grad Inst Architecture & Sustainable Planning, Yilan, Taiwan
[3] Natl Taiwan Univ, Dept Civil Engn, Taipei, Taiwan
关键词
Ou; Yu-Chen; Performance-based contract; urban road maintenance; performance index; design thinking;
D O I
10.1080/02533839.2023.2170922
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maintaining urban roads in a good condition is a basic duty of any city government. Traditionally, urban road maintenance is performed by a contractor that provides the required manpower and equipment resources to complete the necessary daily inspection and repair works. Although the quality of roads is acceptable, the inefficiency is evident everywhere. A performance-based contract (PBC) is used in the field of road maintenance in various countries, primarily for highway or large-area pavement rehabilitation and follow-up maintenance as the subject of the contract. In this study, we applied the design thinking approach to establish a PBC implementation model for urban road patrolling and sporadic repair. Moreover, to ensure the feasibility of the proposed model and to decrease the political risk of execution outcome, we adopted a two-stage validation in this study. The proposed performance indicators were examined by the historical data of road maintenance in Taipei City, and the feasibility of the proposed PBC implementation model was then confirmed by domain experts. The research outcomes could be used to develop PBCs for maintenance management of other infrastructures with better maintenance performances.
引用
收藏
页码:208 / 219
页数:12
相关论文
共 37 条
  • [31] LIFE CYCLE COST COMPARISON BETWEEN PERFORMANCE BASED AND TRADITIONAL CONTRACTS FOR ROADS IN INDONESIA
    Susanti, Betty
    Wirahadikusumah, Reini D.
    Soemardi, Biemo W.
    Sutrisno, Mei
    IIUM ENGINEERING JOURNAL, 2019, 20 (02): : 57 - 69
  • [32] Use of R&M measures in Australian defence aerospace performance based contracts
    Richardson, Debbie
    Jacopino, Andrew
    2006 PROCEEDINGS - ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, VOLS 1 AND 2, 2006, : 331 - +
  • [33] A PERFORMANCE-BASED SEISMIC DESIGN METHOD FOR BRIDGE PIERS UNDER NEAR-FAULT REGION
    Jiang, Hui
    Zhu, Xi
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 609 - 614
  • [34] Configuration assessment of MR dampers for structural control using performance-based passive control strategies
    Wani, Zubair R.
    Tantray, Manzoor A.
    Iqbal, Javed
    Farsangi, Ehsan Noroozinejad
    STRUCTURAL MONITORING AND MAINTENANCE, AN INTERNATIONAL JOURNAL, 2021, 8 (04): : 329 - 344
  • [35] Comparison of the Performance and Energy Consumption Index of Model-Based Controllers
    Minchala-Avila, Luis I.
    Palacio-Baus, Kenneth
    Ortiz, Juan P.
    Valladolid, Juan D.
    Ortega, Juan
    2016 IEEE ECUADOR TECHNICAL CHAPTERS MEETING (ETCM), 2016,
  • [36] Model-based performance test and chilled water fault diagnosis for large-scale water-cooling chillers
    Li, Zhisheng
    Zhang, Guoqiang
    Li, Dongmei
    Liu, Xuhong
    Mei, Sheng
    Wang, Xiaoxia
    Liu, Jianlong
    PROCEEDINGS OF THE 5TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATING AND AIR CONDITIONING, VOLS I AND II, 2007, : 102 - 107
  • [37] Evaluation of the lifetime performance index on first failure progressive censored data based on Topp Leone Alpha power exponential model applied on HPLC data
    Rady, El-Houssainy A.
    Hassanein, Wafaa
    Yehia, Shaimaa
    JOURNAL OF BIOPHARMACEUTICAL STATISTICS, 2021, 31 (05) : 565 - 582